Laserfiche WebLink
r <br />~t 1 of 4 <br />~Io rado Division of Minerals and Geology <br /> RECLAMPTION COST <br />_________________ SUMMARY FORM <br />____________ <br /> <br />PERMIT NUMBER ; _________________ <br />M-86-148 PREP. BY ____________ <br />: SSS FILENAME: <br />M148-0 <br />DATE 03-Mar-99 OPERATION: Neaselskin <br />--------- ---------- <br />PERMIT ACTION Routine bond recalculation <br />RECEIVED <br />---------------------------------------------------- MAR d 5 1999 <br />GRAND TOTAL BOND AMOUNT $5,765 <br />I. DIRECT COSTS =____=______ <br />_________________________________________°______'_____________________==~~+vi n olMinerals 6 Geob9Y <br />A. EPRTHYORK - BACKFILLING 8 ROUGH GRADING <br />Task No.~ Task Description Cast (E) <br />1 ~ Regrade affected area of site above waterline. ~ E1,018 <br />Assume 2 acres graded to an average 2' depth. <br />DEI4V R ~~:.~"ems <br />PUBLI FIL1= C;~r•Y <br />FILE: -$~- IHg <br />~ ~ SITE: e ~•~ <br />i i <br />~ i <br />i i <br />i i <br />i i <br />i i <br />Subtotal (A ): E7, 018 I <br />B. EART HNORK - HIGHViALL REDUCTION <br />Task No.l Task Description ~ Lost (E) <br />2 ~ Spread available overburden over pond slopes. ~ E241 <br />Estimated at 1300c.y. <br />i <br />3 ~ Compact replaced overburden to seal pond. ~ E210 <br />Use scraper for 2 hrs a 105.24/hr <br />Subtotal (B ): E451 i <br />C. EARTHLIORK - UASTE PILE COVER PLACEMENT I~ <br />Task No. -------------Task Description ---------------I Cast (E) <br />I <br />--_-----I--------------------------------------------------I _______-,.--_ <br />Subtotal (C): <br /> <br />