My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39837
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:18 PM
Creation date
11/18/2007 11:13:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Inspection
Doc Date
10/29/2004
Doc Name
Inspection Report
From
DMG
To
Oldcastle SW Group Inc. dba Four Corners Materials
Inspection Date
9/2/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLD02ER WORK <br />Task # : 001 State :Colorado <br />Date : 10/29/2004 County : La Plata <br />User : WHE Site :Thomas Pit <br />Agency or organization name : DMG <br />Permit or other job action :Routine 112c bond review <br />Task description :River bank slope reduction from 1 H:1 V to 2H:1 V <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 1l - SU <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3,208 <br /> Utilization <br />Ownership cosVhour : $48.82 NA <br />Operating cost/hour : $66.09 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $146.67 Total fleet cosUhour <br /> <br />Swell Loose <br />LCY factor: NA volume: 3,208 <br />Source of estimated volume :Exhibit E, Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />$146.67 <br />LCY <br />Source <br /> Operator skill : 0.75 (av <br />Average push distance : 50 feet Material consistency : 1.00 (Cat <br />Unadjusted hourly production : 1,6270 LCY/hr Dozing method : 1.00 (ge, <br /> Visibility : 1.00 (av; <br />Material consistency description : Job efficiency : 0.83 (fshif! <br />Consolidated stockpile Spoil pile : 0.80 (1nd <br /> Push gradient : 1.33 (Cat <br />Average push gradient : 15.00 % (neg) Altitude : 1.00 (Cat <br />Average site altitude : 7,000 fee[ Material weight : 0.79 (Cat <br /> Blade type : 1.00 (S/Sl <br />Material weight : 2,900 Ibs/LCY Net correction : 0.52 <br />Weight description <br />Sand and gravel -Dry Adjusted unit production : 853.75 LCY/hr <br /> Adjusted fleet production : 853.75 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.76 Hours <br />Unit cost : $0.172 /LCY Total job cost : $551 <br />PermiUjob# : M-1976-020 <br />Abbreviation :none <br />Filename : M020-001 <br />Horsepower: 310 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.