My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39800
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:17 PM
Creation date
11/18/2007 11:13:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977443
IBM Index Class Name
Inspection
Doc Date
5/31/2005
Doc Name
Insp Rpt/bond calc
From
DMG
To
Hardrock Sand and Gravel
Inspection Date
4/21/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 003 <br />Date : 05/26/2005 <br />User : GRS <br />State :Colorado <br />County :Moffat <br />Site :Moon Pit #2 <br />Agency or organization name :Colorado Dmg <br />Permit or other job action :Recalculate Bond <br />Task description : Spread fOp501 <br />HOURLY EQUIPMENT COST <br />250 ft. <br />Basic machine :Cat D8R Series ll - SSU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : NA <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br /> Utilization <br />OwnershipcosUhour : $44.24 NA <br />OperatingcosUhour : $61.43 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $24.01 NA <br />Total unit cosNhour : $129.88 Total fleet cosUhour <br />29.68 <br />Swell Loose <br />factor : 1.120 volume : 4,480 LCY <br />volume: 4,000 BCY <br />Source of estimated volume :Permit <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material wnsistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 377.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shiff/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-riJ <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,000 feet Material weight : 0.96 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,400 Ibs/LCY Net correction : 0.64 <br />Weight description <br />Sand - Drv, loose <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.534 /LCY <br />Adjusted unit production : 242.96 LCY/hr <br />Adjusted fleet production : 242.96 LCY/hr <br />Total job time : 18.44 Hours <br />Total job cost : $2,391 <br />PenniUjob# : M-1977-443 <br />Abbreviation :none <br />Filename :M443-003 <br />Horsepower : 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.