Laserfiche WebLink
88CLANATI0N COST SUNMABT cont'd ~ sheet 1 of 1 • <br />Y. PORTAL/BBART 98ALINC <br />Snak No.; Tnek Description Cost 111 <br />, , <br /> <br />Subtotal (HI: <br />------------ <br />L. 08[LL BOLB~NONITOBINC YBLL 58ALINC <br />Test No.; Task Description Cosr (51 <br />........:..................... <br /> <br />Subtotal (L): <br />N. NISCBLLAN80US 88CLANATION TASKS <br />Taek No.; Task Description Cost ISI <br />Structural Denolition ; <br />7 ; Bevegetatioe ; (1,500 <br />; Fencing <br />8 Nobiliastiaa/Denobiliaation SI,JOS <br />Subtotal 1N): 51,805 <br />TOTAL DIBBCT 88CLANATI0N COSTS (subtotals A through N): 525,814 <br />[[. [NDIBHCT COSTS <br />A, CONTBACTOB'9 OVB8B8A0 L PNOFIT <br />Iten No.; [tea Description ; Cost I51 <br />, <br />I. ;Public Liability Insurance.... I.SSOX of dit, (401 <br />2. ; Contractor's Perfor~ance Bond 0.9751 of dir. 5252 <br />3. ; Contractor's Profit.,....,.... 10.001 of dir. (2,585 <br />1. ;Job Superintendent (total fron Worksheet) ; <br />Subtotal (A): 53,234 <br />TOTAL CONSTRUCTION CONTRACT AXOUNT (direct plus 0 d P): 529,085 <br />------------ <br />D. CNLBD CONTRACT ADMINISTRATION BYP8NS85 <br />Iteo Na.; Itea Description ; Cost (51 <br />1. ; Contract Preparation Fees..... 1.2SX a[ cntr.; 51,216 <br />2. DMC Adoio. 8xpenses ; <br />N8T [NDi88CT COST P88CSNTACB: 17.311 Subtotal (B(: 51,236 <br />TOTAL iNDIBBCT 88CLANATION COSTS (subtotals A through B): 51,143 <br />TOTAL P8BFO8NANC8 BOND AMOUNT (direct plus indirect costs): (30,121 <br />~3~ <br />