Laserfiche WebLink
• • ~ = , <br />BOUBLY PSODUCTION coot'd <br />................. <br />Loader Cycle Sise cont'd <br />................. <br />8olliog Sesietance <br />.................. <br />Soadway uoderfootin <br />Bau] :butted dirt, <br />8eturn:8utted dirt, <br />Saul k return Tiae: <br />------------------- <br />Baul bouts: <br />Return bouts: <br />conditions: <br />little/no aeiot.,l-2' fire pen. <br />little/no aaint.,l-2' Lire pen. <br />Crude 6olltag Total <br />Length 8esiet, 8eaiet, 8e¢iet. <br />(ftl (zl (zl (zl <br />100 1.00 5.00 6.00 <br />100 -1.00 5.00 1,00 <br />.. .................................... <br />Sheet 2 of 2 <br />Travel <br />Tine <br />(ain.( <br />0.323 (CAB )arl <br />0.255 (CB8 wry( <br />Total trarel tine = 0.578 <br />Total cycle tine = 1.083 aiautes <br />Loader Bucket Capacity <br />...................... <br />Hated Cepecity= 4.50 LCT (heaped( <br />bucket fill factor= 0.975 Loose nat.-aoist aired aggregates(95 -100i( <br />Adjusted capacity- 1.39 LCT <br />Job Condition Correction Factors <br />Site altitude = 6,D00 ft. <br />Altitude correction factor = 1.00 (GHB cdk( <br />Job efficiency factor = 0.81 (lshlday) <br />Net Correction = 0.83 aultiplier <br />Unadjusted Bonriy Unit Production <br />Adjusted Bourly Uoit Production <br />Adjusted Bourly Fleet Production <br />JOB C09T <br />Fleet nine = 1 Loaders( <br />Unit cost = 10.363 /LCT <br />211.11 LCT)Br <br />201.80 LCT/8r <br />201.80 LCT/Br <br />Total job ties = 121.59 Boure <br />Total job cost = 18,901.30 <br />