Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permit[ee/ Permit Field Visit <br />Person KAISER RESOURCES, INC. Number C-023-81 Date 09/28/2004 Continuation Page <br />28. Performance <br />3=Not Planned, 4=No[ Started, 5 <br />' 1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />I 3. 1 Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hy drologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 3 Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. 1 Surface Water Monitoring <br />9. 1 Drainage -- Acid-Toxic Materials <br />10. 3 Impoundments <br />11. 1 Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. 1 Removal I <br />i <br />2. 3 Substitute Materials <br />3. 1 Storage and Protection <br />Backfilling & Grading <br />1. 1 Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 Highwall Elimination <br />5. 1 Sleep Slopes (includes downslope) <br />6. 1 Handling of Acid & Toxic Materials <br />7, 1 Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. 3 Placement <br />2. 3 Drainage Control <br />3. 3 Surface Stabilization <br />4. 3 Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. 3 Drainage Control <br />2. 3 Surface Stabilization <br />3. 3 Placement <br />4. 3 Inspections and Certifications <br />5. 3 Impounding Structures <br />Use Of Explosives <br />1. 3 Blaster Certification <br />2. 3 Distance Prohibitions <br />3. 3 Blast Survey/Schedule - <br />4 3 W &R d <br />E. <br />F. <br />G. <br />_ arnmgs ecor s 3) <br />5. 3 Control of Adverse Effects <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Administrative ......................................................................... <br />1. Valid Permi[ ................................................... ..................................773.11 <br />2. Mining within Bonded Area .................. ..............................773.11 <br />3 . Terms & Conditions of Perntit ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation .............................. 842.11(e) & 8l6/S1Z131 <br />7. AML Rec. Fees --Non-Respondant ....... .........................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br />I. Drainage Control ............................................ ...._.............._.......45 <br />2. Inspections &Certifica[ions.._ ....................... ..................49(a)(10) <br />3. Siltation S[ructures ......................................... .............................46 <br />4. Discharge Structures ...................................... .............................47 <br />5. Diversions ...................................................... .............................43 <br />6. EfOuent Limits .............................._............... .............................42 <br />7. Ground Water Monitoring .............................. ........................41(c) <br />8. Surface Water Monitoring .............................. .............._........41(e) <br />9. Drainage--Acid -Toxic Materials ................... ........................41(f) <br />10. Impoundments ................................................ ............................49 <br />1 I. Stream Buffer Zones ...................................... .............................57 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal ............................................................ ......................22(a) <br />2. Substitute Ma[erials ........................................... ......................22(c) <br />3. Storage and Protection ....................................... ......................22(c) <br />4. Redistribution ................._................................. ......................22(d) <br />D. Backfilling & Grading .............................. (816/817.95-107) <br />]. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 <br />2. Contemporaneous Reclamation .......................... ........................100 <br />3. Approximate Original Contour ...................._..... ...............102(a)p) <br />4. Highwa0 Elimination .......................................... ...............102(a)(2) <br />5. Steep Slopes (includes downslope) ..................... .......................107 <br />6. Handling of Acid & Toxic Materials .................. ....................102(c) <br />7. Stabilization (rills and gullies) ............................ ......................95(6) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. PlacemenL .............................................................. ..................._.......71(e) <br />2. Drainage Con[rol ........_..._............_ ...................... ............................ 71(f) <br />3. SurfaceStabilization .............................................. .............................7I(B) <br />4. Inspections &Certifica[ions_...._......._......._.._._ .. ............................71(h) <br />F. Coal Mine WastetRePusePiles/Impoundments) ,,,,,(g16/817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization .............................................. ............................83(6) <br />3. Placement ............................................................... ............................83(c) <br />4. Inspections and Certifica[ions ................................. ..........................83(d) <br />5. Impounding Structures ........................................... ................................84 <br />G. Use of Explosives ..................................................(816!817.61-68) <br />1. Blaster Certifica[ion .................. ........................._..............................61(c) <br />2. Distance Prohibitions ................ .........................................................61(d) <br />3. Blast Survey/Schedule .............. .........................................................62-64 <br />4. Warnings & Records ................ ......................................................66 & 68 <br />5. Control of Adverse Effects ....... ..............................................................67 <br />H. Subsidence Control Plan ... ......................................(817.121-122) <br />I. Roads ................................... ..............................(816/817.150-151). <br />1. Road Constmction .................... .......................................................I50(c) <br />2. Certifica[ion .............................. ........................................................I51(a) <br />3. Drainage .................................... ...........................................150(6)-I51(d) <br />4. Surfacing and Main[enance ....... ...........................................I50(e)-I51(d) <br />5. Reclamation...._._..._ ................ ........................................_..............150(f) <br />J. Signs & Markers ............... ........................................(816/817.11) <br />1. Signs ......................................... .................................._........11(a),(b),&(c) <br />2. Markers ..................................... ........................_.......11(a),(b),(d),(e),&(f1 <br />K. Distance Prohibitions ........ ...............................................(761.11) <br />L. Revegetanon ....................... ..............................(816/817.111-116) <br />1. Vegetative Cover ...................... .................................................1 I1 & 116 <br />2. Timing ...................................... ............................................................113 <br />M. Postmining Land Use ........ ......................................(816/817.133) <br /> ar.:,~ n.~~~w~. a. ~9vs Page 2 of <br />~gories <br />Elsewhere, 6=Previously Cited <br />H. 3 Subsidence Control Plan <br />I. Roads <br />1. I Road Construction <br />2. 1 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. 1 Reclamation <br />J. Signs & Markers <br />1. 1 Signs <br />2. I Markers <br />K. 1 Distance Prohibitions <br />L. Revegetation <br />1. 1 Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />General <br />Performance <br />Catagory <br />1) <br />