My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39566
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:09 PM
Creation date
11/18/2007 11:12:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Inspection
Doc Date
2/22/2001
Doc Name
Insp Rpt
From
DMG
To
Climax Molybdenum Company
Inspection Date
10/24/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br />MINE ID # OR PROSPECTING ID#: <br />INSPECTION DATE: 10-24-00 <br />M-1977-493 PAGE: 2 <br />INSPECTOR'S INITIALS: ACS <br />This inspection was conducted as a follow-up to the 9-26-00 inspection related to the <br />Climax Mine's request for surety reduction being processed as revision SR-03 to the <br />reclamation permit. Two reclamation tasks included in the SR-03 application that were <br />not inspected on 9-26-00 were inspected during this site visit, specifically, the <br />demolition of the Precon Building and the demolition of No. 3 thickener, AKA Precon <br />Thickener. <br />The Division of Minerals and Geology (DMG) pzevious ly inspected the No. 3 thickener <br />demolition site on 8-30-99. The tank was removed using cutting torches. The <br />depression in the ground surface associated with the tank remains, as does fine <br />grained residue from the thickening process. The approved reclamation plan requires <br />that following removal of a structure, the site will be filled to grade, and graded <br />for drainage and erosion control as needed (1989 amendment AM-02, page E-3). Based <br />on this reclamation plan requirement and the performance standards of Rule 3 of the <br />Hard Rock/Metal Mining Rules, the DMG must hold sufficient funds to finalize No. 3 <br />Thickener reclamation that may include: <br />• residue removal and relocation, <br />• concrete rubblization and possibly relocation for disposal, <br />• backfilling and grading. <br />The Precon Building location was inspected and it was determined that building <br />superstructure demolition had been completed and the demolition debris had been <br />removed from the former building location. Foundation rubblization and covering with <br />clean fill remains to be completed at the Precon Building site. <br />Based on the observations made during this inspection, the estimated costs for <br />superstructure demolition of No. 3 Thickener and Precon Building will be deducted from <br />the reclamation cost estimate that forms the basis for the amount of the Climax Mine <br />reclamation bond. The amount of bond held by the Mined Land Reclamation Board will <br />be adjusted as appropriate in conjunction with the approval of Revision SR-03. DMG <br />will provide Climax with a complete and updated estimate of reclamation costs adjusted <br />for completed reclamation tasks released through SR-03 and incorporating various <br />pending bond issues discussed during and subsequent to a meeting between Climax and <br />DMG on 3/14/00. The SR-03 approval letter and reclamation cost re-estimate are being <br />mailed on the same day as this report (2(22/01). <br />cc: Carl Mount, DMG <br />2 & E Contact Address <br />NAME Bryce Romig <br />OPERATOR Climax Molybdenum Comoanv <br />STREET Climax Mine <br />CITY/STATE/ZIP Climax, CO 80429 <br />
The URL can be used to link to this page
Your browser does not support the video tag.