Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />This permit is in temporary cessation. There is no operational, other than maintenance, activity at the <br />site. The site was covered with about eight inches of snow. <br />Hydrolo¢ic Balance <br />There was no dischazge from Sedimentation Ponds 1 or 2. The ponds were covered with snow. <br />Backfill and Gradine <br />No backfilling or grading had been accomplished since the last inspection. Remaining backfilling and <br />grading requirements aze associated with long-term facilities. <br />Stu port Facilities <br />There was no change since the last inspection. Structures, other than the sedimentation ponds and <br />ditches, are in disrepair. Some structures have been vandalized. Temporary repairs have been made. <br />General Mine Plan Compliance <br />No permitted work to covert the site from aload-out to a load-in facility had been accomplished. <br />Air Resource Protection <br />The site is stable with regazd to air protection. There is no dust-generating activity at the site. <br />Slides and Damase <br />There is a slide, recorded in May 2000, at a cut on the railroad spur. There is an escarpment near the <br />property boundary. <br />C-1992-081, CP inspection of 5 December 2006, page 3 of 4 pages <br />