Laserfiche WebLink
• ~ III IIIIIIIIIIIIIIII <br />INSPECTION PLAN AND SCHEDULE <br />Operation: Fruita Nos. 1 & 2 Permit No. C-81-015 Year 1986 <br />Month <br />January <br />TT p~_ <br />Partial, <br />Training <br />Items to be Checked <br />General' - Overview of sed. control system, upper <br />ab-ckfiTled portal area, topsoil and subsoil pile. <br />February ~Upttonai <br />Partial] <br />(Temp. <br />cess.) <br />March Complete Check upper backfi 1 area for evidence of fire; <br />haul rd. embankment b cut slope stability, or <br />erasion; small reclaimed area success; vandalism <br />of portal seal; reveg. on TS piles; sed. pond sed. <br />levels, dewatering device. Check road drainage <br />ditches, short circuiting around culverts, berm <br />around loadout, <br />Iona <br />ial] <br />Iona <br />ial] <br />June Complete, Same as for March <br />Group <br />July Partial Review exploration file & check status of <br />(aerial), reclamation on all drill sites. <br />On-the- <br />Ground <br />August ~Optiona <br />Partial] <br />ete Same as for <br />r ~Upttona <br />Partial] <br />Dates <br />November Complete Same as for March <br />~. <br />December Optional i <br />Partial] <br />