Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and date of abatement for the <br />violation, previous violations still requiring abatement and the termination of violations cited during previous inspections. <br />Notice of Violation number NOV CV-2006-004 was abated during this 5 September 2006 inspection. <br />Abatement work was reported complete by the operator on 24 August 2006. The suspense date for abatement <br />work was 15 September 2006. <br />There were no violations noticed during, and no notice of violation was issued as a result of, this inspection. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />C-1982-056. CP Inspection of 5 September 2006 Page 1 I of I I pages. BGW <br />