My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38974
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:49 PM
Creation date
11/18/2007 11:08:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
Inspection
Doc Date
1/3/2005
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
2/7/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.- <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person GEC STRIP,C/O THE Number C-81-037 Date 02/07/2000 Continuation Page <br />28. <br />3=Not <br />B. <br />C. <br />1. -Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. -Liability Insurance <br />5. -Ownership and Control <br />6. -Temporary Cessation <br />7. -AML Rec. Fees -- Non-Respondent <br />8. -AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1.-Drainage Control <br />2.- Inspections & Certifications <br />3.- Siltation Structures <br />4.- Discharge Structures <br />5._ Diversions <br />6.-Effluent Limits <br />7._ Ground Water Monitoring <br />8.-Surface Water Monitoring <br />9.-Drainage -- Acid-Toxic Materials <br />10.-Impoundments <br />11.-Stream Buffer Zones <br />Topsoil & Subsoil <br />1.-Removal <br />2. Substitute Materials <br />3.-Storage and Protection <br />Performance Standard Categories <br />Planned, 4=Nol Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />D. Backfilling & Grading H. <br />Subsidence Control Plan <br />l._ Exposed Openings _ <br />I. Roads <br />2._ Contemporaneous Reclamation 1. <br />Road Construction <br />3.-Approximate Original Contour _ <br />Certification <br />2. <br />4._ Highwall Elimination - <br />3._ Drainage <br />5.-Steep Slopes (includes downslope) q,-Surfacing and Maintenance <br />6._ Handling of Acid & Toxic Materials 5. Reclamation <br />7.-Stabilization (rills and gullies) J, Signs & Markers <br />E. Excess Spoil Disposal 1. <br />Signs <br />I._ Placement _ <br />Markers <br />2. <br />2.-Drainage Control - <br />K. <br />Distance Prohibitions <br />3. <br />Surface Stabilization _ <br />_ <br />4. <br />Inspections & Certifications L. Revegetation <br />- <br />F. Coal Mine Waste 1.- Vegetative Cover <br /> <br />(Refuse Piles/Impoundments) 2._ Timing <br />M. Postminin Land Use <br />1._ Drainage Control - g <br />2.-Surface Stabilization N. Other <br />3. Placement General <br />4.-Inspections and Certifications performance <br />5.- Impounding Structures Catagory <br />G. Use Of Explosives A <br />1.-Blaster Certification - 1) forfeiture evaluation - <br />2.-Distance Prohibitions 2) <br />3.- Blast Survey/Schedu]e <br />4.-Warnings & Records 3) <br />5. Control of Adverse Effects <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Admfnistrative ................................. ........................................ <br />1. Valid Permi[ ................................................... ..................................773.1 <br />2 . Mining within Bonded Area .................. ..............................773.11 <br />3 . Terms & Conditions of Permit ............... ..............................773.17 <br />4 . Liability Insurance ................................. ...............................800.60 <br />5 . Ownership and Control .......................... ..............................778.13 <br />6 . Temporary Cessation......._ .................... .842.11(e) & 816/817.131 <br />7 . AML Rec. Fees -- Non-Respondant ....... .........................870.15(6) <br />8 . AML Rec. Fees -- Failure to Pay ........... ..........................870.15(a) <br />B. Hydrologic Balance .......................... ............(816/817.41-57) <br />I. Drainage Control ............................................ .............................45 <br />2. Inspections &Certifications ........................... ........._.......49(a)(l0) <br />3. Siltation Stmctures ......................................... .............................46 <br />4. Dischazge Stmctures ..................................... ..............................47 <br />5. Diversions ...................................................... .............................43 <br />6. Effluent Liatits ............................................... .............................42 <br />7. Ground Water Moni[oring............_......_ ........ ........................41(c) <br />8. Surface Water Monitoring ............................. .........................41(e) <br />9. Drainage--Acid -Toxic Materials .................. .........................41(f) <br />10. Impoundments ............................................... .............................49 <br />1 I. Stream Buffer Zones ...................................... .............................57 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal ..................................................................................22(a) <br />2. Substitute Ma[erials .................................................................22(c) <br />3. Storage and Protection .............................................................22(c) <br />4. Redistribution ..........................................................................22(d) <br />D. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />E. Excess Spoil Disposal ...........................................(816/517.71-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... ............................ 7I(t) <br />3. Surface Stabilization ............................................... ............................71(g) <br />4. Inspections & Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Piles/[mpouudmenLS) ,,,,,(g16/817.81-84) <br />1. Drainage Con[rol ................................................... ............................83(a1 <br />2. Surface Stabilization ............................................... ...........................83(6) <br />3. Placement ............................................................... ...........................83Ic) <br />4. Inspections and Certifications ................................. ..........................83(d) <br />5. Impounding S[mc[ures ............................................ ...............................84 <br />G. Use of Explosives ..................................................(816/817.61-68) <br />L Blaster Certificatioa ................................................. .........................61(c) <br />2. Distance Prohibitions ................................................ .........................61(d) <br />3. Blast Survey/Schedule ............................................... ........................62-64 <br />4. Warnings & Records ................................................ ......................66 & 68 <br />5. Control of Adverse Effects ....................................... ..............................67 <br />H. Subsidence Control Plan ................................. ........(817.121-122) <br />I. Roads ................................................................ .(816/817.150-151) <br />1. Road Constmc[ion ..................................................... ......................150(c) <br />2. Certification ............................................................... .......................15](a) <br />3. Drainage .................................................................... ...........150(6)-151(d) <br />4. Surfacing and Maintenance ....................................... ...........150(e)-I51(d) <br />5. Reclamation .............................................................. ........................I50(f) <br />J. Signs & Markers .......................................................(816/81 <br />1. Signs .....................................................................................Il(a),(b),&(c) <br />2. Markers ....................................................._...............11(a),(b),(d),(e),&(f) <br />Backfilling & Grading ..............................(816/817.95-107) K <br />Exposed Openings .....................816/817.13, 14, I5, & 823.11 & 21 L <br />Contemporaneous Reclamation ......................... .........................100 <br />Approximate Original Contour ......................... .................102(a)(l) <br />Highwall Eliminatioa ....................................... .._.............102(a)(2) <br />Steep Slopes (includes downslope) ................... .........................107 M. <br />Handling of Acid & Toxic Materials ................. .....................102(c) <br />Stabilization (rills and gullies) ........................... .......................95(6) <br />Postmining Land <br />Revised <br />2 of <br />Distance Prohibitions .......................................................(761.11) <br />Revegetanon .....................................................(816/817.111-116) <br />1. Vegetative Cover .......................................................................111 & 116 <br />2. Timing ..................................................................................................113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.