Laserfiche WebLink
ORIGINAL -PUBLIC FILE <br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: M_1999_nno <br />INSPECTION DATE: ~!1/nd INSPECTOROS INITIALS: ~_ <br />OBSERVATIONS <br />The Division conducted a monitoring inspection of the site at the request <br />of the operator. The operator had submitted a technical revision to change <br />the sequence of mining from the Northwest to the North East side and wanted <br />to meet on site so they can explain the sequence. Present during the <br />inspection was Mr. Dave Tiptton of Gillette sand and gravel. Since the <br />financial warranty in place is more than adequate to cover the phased <br />mining affected areas, the Division will not object the mining sequence <br />change. Topsoil removal had taken place along the north east side of the <br />permit area. Topsoil piles will be protected from erosion through seeding, <br />once the stripping is completed. Existing topsoil piles were stable. A few <br />mining related equipment such as a screen and crusher were located along <br />the North side of the permit area. Permit sign and property markers <br />properly displayed. The TR will be approved; no additional financial <br />warranty will be needed at this time. Operator has also obtained from the <br />Army Corps of engineer, a temporary crossing permit of the perennial <br />stream, during the mining operation. <br />I & E Contact Address <br />NAME: MARK YEVOLI <br />OPERATOR: GILLETTE SAND AND GRAVEL <br />STREET: 19185 N. DIIMnNT WAY <br />CITY/STATE/ZIP: I Im FmN c~ anl9s <br />CC: <br />Harry Posey (e-mail) <br />cc: I' CE <br />I' B L <br />r FS <br />I' H W <br />I' HMWMD (CH) <br />T <br />I' SE <br />I' WQCD (CHJ <br />t OTHER <br />