Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the King Coal Mine for the month of August, 2000 <br />HYDROLOGIC BALANCE: Both ponds had water in them but were not discharging. All culverts and <br />ditches appear to be capable of functioning as designed. <br />GENERAL MINE COMPLIANCE: The site is well maintained and stable and the "bone-yard" is cleared <br />of waste. No problems were noted during the flight. <br />EXCESS SPOILS AND DEVELOPMENT WASTE: The waste pile is stable and all water is diverted off <br />the top and into ditches, however, work on the 100 year clean water diversion ditch and the riprapped <br />side ditches still needs to be completed no later than October of this year. <br />