My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38869
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:46 PM
Creation date
11/18/2007 11:08:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Reports
Inspection Date
2/6/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection conducted by Tom Kaldenbach of the <br />Colorado Division of Minerals and Geology. Rick Mills represented the <br />operator during the field portion of the inspection. <br />More than a foot of snow cover hindered inspection. <br />The longwall is active in panel 13 Right, south of Fish Creek. <br />SIGNS AND MARKERS <br />Topsoil markers were properly displayed at the NMD vent shaft <br />construction site. <br />Hydrologic Balance <br />Fish Creek Borehole (COPS Permit CO-0042161, Outfall 001) - There was no <br />discharge. No problems were found at the site. <br />Support Facilities <br />Progress on recently approved projects: <br />Northern Mining District Vent Shaft (TR-39) - The air drill rig <br />and work crew were working. Holes have been drilled to the <br />Twentymile Sandstone just outside the perimeter of the vent shaft <br />(which is yet to be drilled). The holes are for grouting the <br />Twentymile Sandstone to prevent water inflow into the vent shaft. <br />The raised bore drilling equipment is expected to arrive in a few <br />days. Although frozen now, surface drainage on the construction <br />site is routed to a sediment trap that has a rock filter at its <br />outlet. <br />Rerouting of discharge from old pit, south of pond D (TR-39) - <br />There was no activity on the site. The pump has been installed on <br />the steel platform on the north bank of pond D. The desander <br />building is completed. <br />Yampa Valley Electric Capacitor Bank {MR-174) - Concrete footings <br />have been installed. There was no activity on the site. <br />Subsidence <br />The subsided section of County Road 33 was in good shape. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.