My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38817
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:44 PM
Creation date
11/18/2007 11:07:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
10/13/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Backfill and Grading (Cont'dl <br />Extent of rill and gully repair work was difficult to discern from the images. One gully location described <br />previously along the steep reclaimed road segment in the upper 006 watershed, southeast of the aspen <br />testplots appears to have not yet been repaired. As noted previously, water bars along the reclaimed <br />road segment had breached, causing a gully to form. <br />To soil <br />Topsoiling operations were continuing in various locations. A major portion of the graded area in the Wolf Creek <br />mine block still remains to be topsoiled. Topsoiling is nearing completion in the 017 watershed (a portion of the <br />steep south facing slope near the west end of the area remains to be completed), has been completed in the <br />South Leg Wadge Pit south of Stock Pond T-27, and in the North Leg Wadge Pit. Topsoiling was in progress <br />and nearing completion in lower portions of the 016 watershed, in the vicinity of the aspen establishment site in <br />that locations. Since the previous inspection, topsoiling had been completed along most of the reduced Haul <br />Road "J", with only short sections along the curve in the middle segment of the road, and the end segment near <br />the 016/016A ponds still to be topsoiled. <br />Reve~c elation <br />Drill seeding appears to have recently been completed on the topsoiled slopes of the North Leg Wadge Pit, the <br />areas affected by regrading above the ridgeline slide area, and recently topsoiled areas in the 017 watershed <br />south of the main permanent channel. <br />The new aspen establishment area in the lower 016 watershed has been fenced (or at least the posts have been <br />placed). It could not be determined whether shrub and tree planting had been conducted within the area. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.