Laserfiche WebLink
Nu new gullies have Je~rlope~! in the l~ortlt I'it area. where rrusiun occurred in summa ~INIh <br />I uhlc I. hrlu~~, summarizes erosional future. that Mill nceJ wur6. <br />Table I - Ihainage anJ erosional futures nce.ling work <br />Location Erosional <br />Features Repairs or work needed <br /> Severe <br />North end of North gullying (as Regrade, shape slope. and place armor to protect <br />Pit previously backfill from high velocity runoff <br /> described) <br /> Three rills Rock check structures have been installed ~n the ells <br /> . <br />each a few and some rock has been placed at the upslope ends <br />North Pd backfill hundred feet of the rills, but additional rock or vegetation ~s needed <br /> long at the heads of the ells to reduce the velocity of water <br /> flowing into the rills_ _ <br />Base of <br />northeastern part Gullies (as <br />of North Pit previously Prevent gully development by controlling runoff on this <br />backfill, downhill described) steep slope. <br />from straw <br />waddles <br />Photo I Funnrr ryuipmrnt zh+ragr )nrd ut .oath end ..I {?ernm area <br />