Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACT~iA~TG <br />Mine Site Evaluation <br />State Program NoV 2 4 2003 <br />1. Permittee/Person 9. Permit ~jgof Minerals 8 Geology ] 0. Permit Type <br /> TRAPPER MINING, INC. C-010-S1 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> PO BOX 187 06/05/2003 OBR ^Y <br />3. City 4. State mm-da -yyyy <br /> <br />CO 14. Permit Status 15. Site Status 16. Facility Type <br />Crai ~ Ap <br />DG <br />5. Zip Code 6. Phone Number A <br /> 17. OSM Office #,' 18. CCID # 19. Land Code <br />81626 (970) 824-4401 <br />140 SF <br />7. Operator Name. if Different than Permittee <br /> 20. M.S.H.A ID #I 21. State Abrev. 22. County Name <br /> MOFFAT <br />e Na <br />Mi <br />8 OS-02838 CO <br />n <br />me <br />. <br /> 23. AVS Petmittee Entity ID Number 24. State Office <br />TRAPPER MINE <br /> 056887 <br />25. Hours 26. Sin re Block <br />g~ 27. Reviewing Official: <br />e <br />1.0 a. Permit Review ~ N(,,, <br /> <br /> Signature: Signature: <br />0 b. Site Visit Time <br />10 <br />. RANDY PAIR ID # 997 <br />c <br />Travel Time Review Date: 1 ~ l ~ / ~ 3 <br />g,p <br />. Printed Name: mm - dd - yyyy <br />2,0 d. Report Writing Date: `~/06/2003 Is Supplemental MSE Page Used Y/N~ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />0~,,,.Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. A61., good Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) A82..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... good Release: Reclamation completed and State Regulatory A63..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermilted. <br />Site Status Codes -.Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting Phase bond release, actions to revoke the permit, tolled the <br />EX..Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ lion of forfeited site is in progress. <br />have not begun. 817.131(6). FR.. Forfeited and Reclaimed: Forfeiture <br />P1 <br />I R <br />l <br />t Ph <br />l <br />l <br />P <br />l <br />I b <br />d <br />l <br />i <br />e <br />ease: At <br />ase <br />AP.. Active Goal Producing: Goa <br />surtace mining <br />... <br />hase <br />eas <br />on <br />re <br />ease rec <br />amat <br />on completed. <br />activities are occurring, grantetl for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing. Active non-producing permits, panial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit talus is alive, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining adivit ,and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H... Exploration Permits L... Remining site permitted <br />A... surtace E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and Z3 <br />C... Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Asriculture Reeulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each asenc 's <br />responsiveness to small business. If you aze a small business (a business with 500 or fewer employees including those of affiliates) page 1 of /'~ <br />and wish to comment on the enforcement or compliance activrties of OSM, call ]-888-REG-FAIR (1-8RR-734-3247). aid:.ao~amx~ a. tvsx <br />