Laserfiche WebLink
L ~- ------ - - <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 12/18/2002 <br />User : SSS <br />Agency or organization name : DMG <br />Permit or other job action :Routine Reclamation Cost Estimate <br />Task description :Regrade east parcel pit floor <br />HOURLY EQUIPMENT COST <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Delta <br />Site :Benton Dawson Gravel <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown <br />~---- <br />MATERIAL QUANTITIES <br />Initial <br />volume : 6.453 <br /> Utilization <br />Ownership cost/hour : $49.50 NA <br />Operating cost/hour : $85.98 100 <br />Ripper op, cosUhour : $1.87 25 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $145.35 Total fleet cost/hour : $145.35 <br /> <br />Swell Loose <br />LCY factor : NA volume : 6,453 LCY <br />Source of estimated volume :4 acres graded at 1 ft depth <br />Source of estimated swell factor :NA <br />r--------v- -- <br />` ------_-------- -------- - --------- __-- - --- - -- - --I <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 <br />Average site altitude : 5,000 fe <br />Material weight : 3,250 Ibs/LCY <br />Weight description <br />Grave! - Pitrun <br />Operator skill <br />Material wnsistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gratlient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br /> <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.00 <br />1.00 <br />0.71 <br />1.00 <br />0.37 <br />517.89 <br />517.89 <br />LCY/hr <br />LCY/hr <br />-- - - -t <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 12.46 Hours <br />Unit cost : $0.281 /LCY Total job cost : $1,811 <br />r -- -----_---__ <br />- - -- - - - <br />I---- - - - - - - -- - - <br />PermiUob#:M-1983-209 <br />Abbreviation :none <br />Filename : M209-03a <br />