Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />1. Permittee/Person 9. Permit Number 10. Permit Type <br /> ENERGY FUELS MINING CO. C-055-52 PP <br /> 2. Address 1 ]. Field Visit Date 12. ose 13. SRA Present <br /> MR. WEAVER, PO BOX 449 05/30/2000 ~ ^Y <br />3. City 4. State mm-dd -YYYy <br /> <br />FLORENCE CO 14. Permit Status 15. Site Status 16. Facility Type <br /> A^ MC <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81226 (719) 784-6395 <br />140 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # ZI. State Abrev. 22. County Name <br /> <br /> OS-0325 CO LAS <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Of&ce <br />RATON CREEK MINES <br />091985 <br /> <br />25. Hours 26. S'li tt ve 1 z 27. Reviewing Official: <br />3.0 a. Permit Review <br /> Signatw : Signature: <br />0 b. Site Visit Time <br />3 <br />. MITCH ROLLINGS ID # 370 <br /> <br />c <br />Travel Time Review Date: / / <br />. <br />6.0 Printed Name: mm - dd - yyyy <br />1.0 d. Report Writing Date: 03/31!2005 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes kern 12 CCR....Citizen Complaint Referral (non site visit) <br />Dom,.„Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left We site without completing reclamation as defined in <br />A.... Active: Coal mining antl reclamation activities occurring or 30 CFR 840.11(8) <br />ppermitted bui not yet dlsturbetl. A61.. Bond Forfeiture: bond forfeiture oTficially in process or completed, and. <br />it <br />Ph <br />Il <br />l <br />d <br />I <br />i <br />ve (Permanent Program Perm <br />): <br />ase <br />comp <br />ete <br />IN.... <br />nact <br />or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Inlerim Program Permit) A82..Panially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated, used to reclaim site, bui site not reclaimad to Progam standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has keen reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpennitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. fVo Disturbance: No coal mining antl reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The (ZA is pursuing <br />operations have been started. site regraded and awaiting phose bond release. actions to revoke he permit, collect the <br />d <br />l E <br />i <br />ti <br />i <br />rf <br />b <br />dl <br />l <br />C <br />l <br />ormance <br />(s), an <br />or rec <br />ama- <br />xplorat <br />on: <br />oal exp <br />ora <br />on operat <br />on <br />ons TC..Temporary Cessation: The RA has granted ppe <br />EX..Coa <br />have started and where coal mtning operations cessation of mining pursuant l0 30 CFR 816! tion of forfeited site is in progress. <br />have not begun. 817.131 b). FR.. Forfeited and Reclaimed: Forfeiture <br />l <br />i <br />P1 <br />Ph <br />I <br />l <br />A <br />l <br />t Ph <br />I b <br />d <br />l <br />l <br />ti <br />t <br />d <br />( <br />on comp <br />e <br />... <br />ase <br />e <br />ease: <br />eas <br />ase <br />on <br />re <br />ease rec <br />ama <br />e <br />. <br />AP.. Active Coal Producing: Coa <br />surtace m <br />ning <br />t <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, paNal bontl release. is permitted but there is no bond. <br />facilityy such as ti le or preporation plant. P2.. Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />ti <br />l <br />th <br />i <br />it <br />d <br />h <br />t <br />ki <br />d <br />i <br />i <br />f <br />ave or are <br />ace an <br />or <br />e ent <br />re perm <br />te <br />area. opera <br />ons <br />a <br />ng p <br />NM..No IvTining: The Permit Status <br />s alive, site <br />s <br />not in Temporary Cessation, no surtace coal p3.. Phase IIf Release: Reclamation completed antl the activity is not coveretl byy the <br />mining aclivd ,and site not re raded, the RA has released all band. re wired permits from the fiA. <br />Facility Type Codes -Item 16 D_.Ancillary (Haulroad, Conveyor, andlor Rails) H... Exploration Permits L.,. Remining site permitted <br />A... Surfaca E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR786.26 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 213 <br />C... Preparation Plant G... Stockpiles K... Government Financed Constmction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boazds were established to receive comments fro <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. If you aze a small business (a business with 500 or fewer employees including those of affiliates) page l of <br />_ <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-8R8-REG-FAIR (1-888-734-3247). xrys~a n«nnx, a, i9sa <br />