Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was an aenat inspection of the Ohio Creek Coal Mine #2 for the month of December, 2003 Weather <br />at the 6me of the inspection was sunny and cold and approximately one foot of snow on the ground <br />Hydrologic Balance: The pond has some snow in rt but is not discharging. All ditches appear snow <br />covered but capable of functioning as designed. <br />General Mine Comuliance: The site is stable and will probably be under snow for the remainder of <br />winter Some small rills can be seen at the eastern (left side of photo) edge of the reclaimed area and <br />should be examined this coming spring to insure there ~s no excessive erosion <br />