My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38561
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:35 PM
Creation date
11/18/2007 11:06:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991037
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
8/22/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - BULLDOZER WORK <br />Task k: 4 Prep. by: TAS Task File Name: M0J7-4 <br />____________ _________ _________ <br />gate: OB/26/97 Pe rmi[ k:M-91-037 Mine: Gold Park Placer <br />____________ _________ ___________________ <br />Pexmi[ Action: Final Reclamation <br />_______________________________________________ <br />Task Description: Finish Grading - J acre feet <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9N <br />Blade Type: UNIVERSAL <br />Attachment kl: ROPS Cab <br />Attachment b2: N/A <br />Horsepower: 3]0 <br />Shift Basis: 1/day <br />Cost Breakdown: <br />------"" "" U[iliza [ion k <br />Ownership cost/hr = 542.20 N/A <br />Operating 6 overhaul cos[/h r- dozer = $]9.98 100 <br /> -ripper = 50.00 N/A <br />Opera [or cost/hr = $22.95 N(A <br />Total egpt. unit cost/hr = 5139.]] Total Eleet <br />________ cost/ hr : $179.77 <br />________ <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 9,840.0 LCY Fa c[or: N/A Volume: 4,840 .0 LCY <br />Source of quantity take-off: permit <br />________ <br />__________________________ <br />_____ <br />___ <br />_________ <br />Source of est. swell factor: program <br />________ <br />__________________________ <br />_____ <br />___ <br />_________ <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Facto rs <br />Avg. push distance: loo ft. _________________________ _____ __ <br />"""" ~ Operacor.......... 0. 75 (avg.l <br />Unad7 usted hourly Mac. consistency.. 0. 60 (Cat tbl) <br />dozer production: 1239 LCY/hr Dozing method..... 1. 00 Igen.) <br />" " " " ' Visibility........ : 1. 00 (avg.) <br />Material consistency: Job efficiency.... 0. 83 (lsh/dayl <br />Rock, poorly ripped or blast ed Spoil pile factor. 1. 00 (doz-ocl <br />"""""""~"""" """" Push gradient..... 1. 02 (Ca[ tbl) <br />Avg. push gradient: 1.00 R (neg) Altitude dera[ion. 0. 96 (Ca[ [bl) <br /> Material weight... 0. 70 (Cat tbl) <br />Avg. site altitude: 9500 <br />________ Et. <br />_ Blade type........ <br />_________________________ 1. <br />_____ 00 <br />__ IS, SU. UI <br />Material weight 3300.00 16/LCY Net .lob Correction 0. 26 <br />Mat. Des cr.: """""""" " "" <br />Decomposed rock - 75t Rock, 29& Earth Adjusted Unit Prod.: 315. 27 LCY/hr <br /> AdJ usted Fleet Protluc lion: 315. 2] LCY/hr <br />JOB COST <br />Flee[ size 1 <br />________ Dozer lsl Total Job Time: <br />____ 15. <br />_____ 35 <br />__ Hours <br />Unit Cos[ 50.993 /LCY Total Job Cost: $2 ,145. 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.