Laserfiche WebLink
April comments "A minor amount of grading remains to be completed on the west highwall <br />area above pond 6 and pond 7. The grade on the inlet ditch to pond 6 requires <br />improvement as evidence by water ponding in the ditch immediately above the pond." <br />Observation: Grading above pond 6 and pond 7 was found completed. The grade on the <br />inlet ditch above pond 6 had also been modified to prevent ponding in the ditch. <br />Permanent road through saddle area <br />April comments: "Where the road crosses the disturbed area. it remains the responsibility of <br />LCC to construct and maintain the road to function properly. Additional sub-base and road <br />shaping will improve the road in this location as well as other locations." <br />Observation: The road through this area was found reshaped with a number of flow <br />diversions in the road ditch as the road ascends the hill to the west (see photo). Surface <br /> <br />- - 2004 6 1~ - -, <br />With the exception of the ditch work on the east side, all work required was completed. The <br />applicant should be commended for completing the work to a high standard and in a timely <br />fashion. All parties agreed that the remaining work on the east side ditch would be <br />completed by the applicant, then inspected and documented by the DMG during a <br />subsequent monthly inspection. All parties would be notified via an inspection report. <br />Following a brief conversation, the inspection was terminated. <br />6 <br />~,R <br />-t~~ <br />a <br />..,. -- , _ <br />~~ - -= <br />- _~ - <br />