Laserfiche WebLink
®t;FICE <br />Agency or organization name : DMG <br />Permit or job action :Routine 110c bond review <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Disperse stockpiled material, dress slopes loader 1 39.3 $2, 307 <br /> <br />002 -Dispose misc debris NA 1 4.0 $55 <br /> <br />003 -Revegetate 3 acres affected land above waterline revege 1 3.0 $1,623 <br /> <br />004 -Haul reclamation equipment to and from job site mobilize 5 0.2 $78 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 46.62 $4,063 <br />' includes inflation (actor adjustment of : NA % <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability lflSUranCe: <br />Pertormance bond: <br />Job superintendent <br />Profit <br />not required (or eqp. operator serves as super.) <br />PROJECT MANAGEMENT - <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />'contingencies accounted /or of task level <br />TOTAL DIRECT COST= $¢,063 <br />1.55 <br />1.05 <br />NA' <br />of direct total = $63 <br />of direct total = $43 <br />NA NA total = NA <br />of direct total = $406 <br /> TOTAL O & P = $512 <br />CONTRACT AMO UNT (direct + O 8 P) _ $4, 575 <br />10.00 <br />NA NA NA total = <br />5.00 % of cntr. NA total = <br />NA' NA total = <br />TOTAL INDIRECT COST = <br />TOTAL BOND AMOUNT (direct + indirect) _ <br />NA <br />$229 <br />NA <br />a4,ov4 <br />