Laserfiche WebLink
<br />V <br /> <br />"Waste Piles: Do engineering designs exist along with pictures of the construction <br />of the underdrain? Where? <br />"Are quarterly PE inspection reports and proctor density test results available for <br />inspection?/ Where? <br />(iv) The degree to which erosion and sediment control is present and functioning; <br />Do all disturbed areas drain to permanent ponds or impoundments? If not, describe <br />those areas that do not., Is a sediment pond necessary? <br />I,t/,~1, ~cr1,~4-r,n., o-~ i s- P r . ~. ~~ o-~-t,.~,- ,o~,~s ~o ~ G,",-,o ;,,~ <br />Describe any mechanical treatments to the reclaimed surface (furrowing, terracing, <br />imprinting, pitting, ripping, etc.) <br />Describe any areas of rills and gullies noting depths, lengths, frequency and estimates <br />of /a~ge of development an~7tJ recent erosional activity r <br />K .1 ~ c .. _ ~ ~ , . ~ ~ ro c ~Ltl irru~ r .n., sin... ~ /LY'ect,9 D T V~ C'G~+-ra -~id1.~ <br />Describe any arg~s of sediment deposition in ditches, livestock tanks, or ponds <br />5 <br />Describe whether rainfall or snowmelt (or both) are the primary cause of erosion or <br />