Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />N/A Blasting Variances <br />N/A Pre-Blast Surveys <br /> CERTIFICATIONS <br />y Pond Certifications 2, 2A, 2B, 3, 4, 5, 11, 11A, River Pond:: <br />y Containment areas No.1 (Sl7/93), No.2 (4/26/93), RDA-SE (2/26/93), <br />RDA-SW (4/24/93) <br />N/A Annual Certs. for Impoundments (Lg) N/A <br />N/A Excess Spoil or Underground <br />Development Waste <br />N/A Quarterlylnspections 3/29/95 <br />N/A Compaction Testing <br />N/A Final Certification <br />y Coal Processing Waste Banks 4th Qtr 94, 12/28/94 <br />y Haul Road Certifications On Maps <br /> ADDITIONAL RECORDS <br />y Stipulation #72, Structures- Quarterty Most recent in DMSG Office dated June 4, 1995 <br />y EPA Hazardous Waste Permit, <br />Conditional Exempt Generator Permit #0000 012 7886 <br />y Subsidence Monitoring 1st Quarter <br />6 <br />