Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action. <br />This was a partial inspection. conducted by Kent Gorham of the <br />Colorado Division of Minerals and Geology. This former, contour <br />strip operation is bond revoked. inspection frequency is quarterly, <br />with one complete inspection each year. Ground conditions on this <br />day were dry. The weather was sunny and warm. <br />Hydrologic Balance <br />.~.~ <br />h i <br />• ~ <br />~ ~ Y• <br />,- <br />.~ <br />~~` I•' <br />Mr , y,•,~ <br />' ~ N.~ <br />Ili! :..~: r,~'~s,``.v~. ., <br />~J~~~,~,~~''1~~' 1001 9 H ' <br />, <br />The repair work on the ditch north and east of reclaimed pond 15-P1 <br />is noa~ complete. Check dams were installed up to the first upstream <br />bend in the ditch and the inier_ area to the box culvert has been <br />lined with riprap. <br />