Laserfiche WebLink
cb pf~CO~~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />MINERALS PROGRAM INSPECTION REPORT <br />_A <br />'•, ,6 •' PHONE: (303) 866-3567 ,~~~b~ <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report documents <br />observations concerning compliance of the mining operation with the permit and the regulations of the Mined Land Reclamation <br />Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested corrective actions and/or 3) Possible <br />violations to be considered for possible enforcement action by the Mined Land Reclamation Board. OPERATORS SHOULD <br />RECLAMATION BOARD. <br />MINE NAME: Gilsonite Pit's OPERATOR: Elam Construction. Inc. <br />COUNTY: Mesa MINERAL: S d Gr el PE PERATION: Surface/112c <br />INSPECTOR(S): Steve Shue <br />MINE ID # OR PROSPECTING ID #: <br />INSPECTION DATE: 1-14-2003 DATE F COMPLAINT: N/A <br />INSPECTOR'S INITIALS: SSS TIME OF DAY (MILITARY): 0900 <br />INSPECTION TYPE CODEItI: PR POST INSP. CONTACTSIZI: NO <br />JOINT INSP. AGENCY CODEt2I: NO REASON FOR INSP. CODEI3I: IE <br />WEATHER CODEI4I: CR BOND CALCULATION TYPEISI: NN <br />OP. REP. PRESENT: Gavle Lvman~ Steve Kaspar <br />1. INSPECTION TYPE CODE - [CL-IN: IL=Illegal Operation, MI=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Pre-operation] <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - [CL-AG: NO=None, BL=BLM, CH=Colo. Dept. Health; CL=Land Board, <br />CT=Citizen; CW=Wildl'rfe, FS=Forest Service, HW=Hwy. Dept., LG=Local Government, SE=State Engr.] <br />3. REASON FOR INSPECTION CODE - [CL-RS: AG=Other Agency Request, CT=Citizen Complaint, IE=Normal I&E Program, HP=High Priodly, <br />PY=Priority] <br />4. WEATHER CODE- [CL-1/VE: CL=Cloudy, CR=Clear, IN=Inclement- prevented inspection, RN=Raining, SN=Snowing, WD=Windy] <br />5. BOND CALCULATION TYPE - [BC=Complete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. <br />separate cover when the <br />If PV is <br />action. <br />notified <br />(AR) RECORDS ................................ NA <br />(HB) HYDROLOGIC BALANCE............ NA <br />(PW) PROCESSING WASTE/TAILING.. NA <br />(MP) GENL MINE PLAN COMPLIANCE. NA <br />(SM) SIGNS AND MARKERS .............. NA <br />(ES) OVERBURDEN/DEV. WASTE...... NA <br />(AT) ACID OR TOXIC MATERIALS...... NA <br />GENERAL INSPECTION TOPICS <br />(FN) FINANCIAL WARRANTY........ NA <br />(BG) BACKFILL & GRADING......... NA <br />(SF) PROCESSING FACILITIES..... NA <br />(FW) FISH & WILDLIFE ................ . NA <br />(SP) STORM WATER MGT PLAN.. . NA <br />(SC) EROSION/SEDIMENTATION.. NA <br />(RD) ROADS ................... NA <br />(EX) EXPLOSIVES.........., NA <br />ITS) TOPSOIL ................. NA <br />(RV) REVEGETATION...... NA <br />(SB) COMPLETE INSP...., NA <br />(RS) RECL PLAN/COMP... NA <br />(OD) OFF-SITE DAMAGE .............. NA <br />(ST) STIPULATIONS......,. NA <br />Y =Inspected and~Found in Compliance PV =Inspected and Possible Violations Noted PB =Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />ORIGINAL -PUBLIC FILE <br />