Laserfiche WebLink
~cadac.e aqa-peen[: • <br />.................. total 'sq?. <br />9achine Description Cost/hr <br />• <br />Feet Size Hau: Trip Return Trip <br />(no. hauled Cost/hr Ccst;hr <br />-------------------------------------- <br />-------------------------------------- <br />sheet ~ of 2 <br /> Subtotals <br />tliRICEYDD SCFFORT E6CIFMENT: ...'..... .'...'... <br />" " " " " " "" " " "" "' Izight Ownership Gaul Rig Elezt Size Raul ',rip fleturm Trio DOT Perm_t <br />Nom-Roada6le Bqp. Description I:onsl Cost~hr Cestihr (na. h auled; Castlcr Cost/br Cast;~ea <br /> SuS:r.als <br />......... <br />......... ......... <br /> .. t3. E^y p. [i.., <br />° S:i,2 RaC. Tap r2:ur.^. T':r <br />3oadab'e Eqp. )escription ;ost;hr (ra <br />h a:!zd, Cos:; hr Cas:;hr <br />Scbtotals <br />eaUIF9E,`!",' UAUL DiSTANCR A ?IXE <br />------------------------------ <br />Nzar°s: aaj^• _,:7 ,r town wi-ain proje^_. =sea r°groc: ~aaar .':; <br />Total onz way nave: d'stance . :5.9 mi.e;. A'J2Cag°_ travzl spend = 4).00 mc:. <br />...... ............. <br />Joi icz - Van Rcadahle Equip.= <br />JCR COST <br />9.3.i hours !oad Roadai!z Equip.= <br />9.4: l~osrs hail <br />D.:3 'coos un!oad <br />0.45 hours re :urn <br />------------------- <br />Total hob/Demob Cost ~ X439.07 <br />NiA hours load <br />P.45 !our, hau_ <br />hIA hours unload <br />0.45 hours retain <br />NOTE: Non-roadablz equipment (Saul rig requited to trar.sport~ mob/demob costs based on ~ round trips, each trip <br />consisting of a or.e-way loadzd haul and a one-way empty return. Roadable equipment (no haul rig rzquiredj <br />costs based on one round trip. Colorado DOT requires special permits far oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig or. each loaded trip. <br />Additionally, pilot cars lone or two per rig depending on degree of oversized are also required [or oversize <br />equipment haulimg, and loading/unloading times must be increased substantially For equipment which must be <br />partially dismantled for transport snd re-assembled at the job site. Costs for lifting equipment and other <br />support equipment weeded for this work should be included in the mob/demob costs. <br />