• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-07-064 <br />INSPECTION DATI: 3/14/96 INSPECTOR'S INITIALS WHE <br />The following problems IPBI andlor possible violations IPVI land suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The inspector noted <br />on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />All fuels, lubricants and chemicals need to be stored in a controlled manner, at a designated location, with adequate spill <br />prevention and spill containment controls. Spill containment controls typically include measures such as construction of a <br />containment berm surrounding each fuel tank or fluid storage area. Berm surrounding fuel tanks should enclose sufficient area <br />to ensure containment of volume equivalent to tank capacity. Containment areas should be lined with an impermeable liner <br />to ensure spilt fuel or fluids not escape and degrade quality of ground and surface waters (Rules 3.1.6 and 3.1.71. <br />CORRECTIVE ACTION: Construct adequate spill prevention/spill containment control structures for all fuels, lubricants and <br />chemicals by May 24, 1996. <br />5124/96 <br />PB or PV PB <br />TOPIC(S) HB <br />AT <br />2. Pursuant to Rule 4.2.1, DMG will review the amount of financial warranty required for the Dalton Land & Cattle operation. A <br />detailed estimate of the recalculated cost, based on the approved Mining and Reclamation Plans and conditions observed during <br />the inspection, will be forthcoming. <br />CORRECTIVE ACTION: Pursuant to Rule 4.2.1121, should DMG review and recalculation indicate that the current amount of <br />financial warranty is insufficient to perform reclamation, the operator shall have up to sixty 1601 days to post additional financial <br />warranty from the date of written notice of such insufficiency. If the operator disagrees with DMG notice to increase the financial <br />warranty, DMG shall schedule the matter for a hearing before the Board. <br />FUTURE <br />PB or PV PB <br />TOPICISI FN <br />3. <br />PB or PV _ <br />TOPICISI _ <br />lend of report) <br />