Laserfiche WebLink
FW: Pics <br />Keffelew, Berhan <br /> <br />From: <br />Sent: <br />To: <br />Goodrich, Gary [GGoodrich@AngloGoldAshantiNA.comJ <br />Friday, August 03, 2007 11:56 AM <br />Keffelew, Berhan <br />Cc: Vanoni, Mark <br />Subject: FW: Pics <br />,~-~~~-~ <br />Berhan, here is a good collection of photos showing that provisions are in place for not sending storm water <br />toward the phase 4 LVSCS. The sediments in the perimeter ditch are drying and there is no standing water. The <br />LVSCS solution in reinfiltrating through the pert pipe with no exposed solution. As soon as the sediments dry, <br />they will be excavated from the ditch and we don't anticipate further standing water in this area. Let me know (or <br />Mark) if you need additional detail. <br />Gary W Goodrich <br />CC&V Environmental Manager <br />AngloGold Ashanti (Colorado) Corp. <br />Tel: (719) 689-4056 <br />Fax: (719) 6893254 <br />E-mail: ggoodrich@AngloGoldAshantiNA.com <br />Confidentiality Warning <br />This a-mail message contains confidential information which is <br />intended for the use of the person to whom it is addressed. If you <br />received it in error, please notify the sender and delete the <br />material from any computer. Any disclosure, re-transmission, <br />dissemination or any other use of this information is strictly <br />prohibited. <br />From: Vanoni, Mark <br />Sent: Friday, August 03, 2007 11:27 AM <br />To; Goodrich, Gary <br />Cc: Deemer, Denny <br />Subject: Pics <br />«New W Cnr Sump 2.jpg» «New W Cnr Sump.jpg» «Removed Pipe Closeup.jpg» «SW Ramp <br />Cut2.jpg» «Cleaned out S Cnr Sump.jpg» «Ripped NW ramp.jpg» <br />Gary, <br />There are more located in the following folder: G:\EAD\EADSTAFF\Vanoni\Projects\Ph46 Surface Drainage. <br />Mark Vanoni <br />Sr. Environmental Coordinator <br />AngloGold Ashanti (Colorado) Corp. <br />8/10/2007 <br />