Laserfiche WebLink
• G~- <br />STATE OF <br />OFFICE OF THE STATE ENGINEER <br />Division d water Rewuroes <br />OepnOment of Wtual Rrsauraes <br />1313 51Kmsan Stmet Roan a/a <br />De11VlI Coloredo 80103 <br />Phone (3031 Bee-358t <br />FAX D03) Bee-35$9 <br />vrwwwaterstate.onut <br />DATE: <br />TO: <br />CC: <br />RECEIVED <br />MAY~S~ <br />Divition of Minerals and GeololY <br />es once to Reclamation Permit Application Consideration <br />May 25, 200 <br />e Gonima Environmental Protection Specialist <br />• r <br />it <br />eia owns <br />Goemar <br />weedt ccorge <br />r.K,mr. dn+tor <br />Hal 0. SmPsan, P.E <br />sore Fnq,re. <br />Division 1 ce, Distrkt a er W ~ ~~ <br />FROM: loans Coman c'u E.I. <br />RE: artnership, File No. M-2006-042 <br />Operator: M - 0-887-3624 <br />Contact: Mark Kokes-970-867.3624 <br />Section 34, Twp. 12 North, Rng 49 West, 6th P.M., Logan County <br />' CONDITIONS FOR APPROVAL <br />® The proposetl operation does not anticipate exposing groundwater, Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^reclamation, <br />^ water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of grountl water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, pdor to obtaining a permf4 an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a wetl permit, the applicant must conduct a Reld inspection of the sRe and document <br />the locations of all wells within 600 feet of the permit area. The applipnt must then obtain a waiver of <br />objection from all well owners with wells wHhin 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or Impact the histork operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />® The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a Legal <br />source, or the water was diverted in priority under a water right decreed for such indusVial use. <br />COMMENTS: If stormwater runoff Is Intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator wall need to make replacements for evaporation. <br />The applcant may contact the State Engineer's Office with any questions. <br />