Laserfiche WebLink
Pa e 3 <br />I MINE ID#OR INSPECTOR'S <br />PROSPECTING ID #: M-1973-021 INSPECTION DATE: 7/21/06 INITIALS: CMR <br />4. Reclamation <br />a. Reclaimed area above Central Quarry. An approximate 11.6 acres area above and along the west <br />side of the North Quarry has been reclaimed. The benches have been backfilled and revegetated. The <br />slope was approximately 2 vertical to 1 horizontal. The slope appeared reasonably well vegetated and did <br />not show evidence of soil movement (these observations were made from the far side of the quarry) <br />b. Backfilled Slope. A Technical Revision (TR02) was approved for the design and construction of <br />engineered terraced slopes as a way of disposing of waste material and mitigating visual issues along an <br />older wall on the northwest side of the mine site. Two contiguous areas to the west of the North Pit have <br />been reclaimed so far. These areas are an initial test of the method of installing the engineered backfill. <br />There was an investigation of the slopes occurring at the time of this inspection. The slopes were not <br />revegetated, with the exception of some trees near the top of the slope. <br />5. Water Storage. The Central Quarry had been turned into a water storage reservoir for the Town of <br />Morrison (AM04). During the inspection the reservoir appeared full. A pump station had been constructed <br />above the reservoir along with a pipeline to carry the water offsite. According to the Operator <br />Representative the reservoir will be moved to the North Quarry once mining is completed there, and the <br />Central Quarry will be filled and used as a processing area for the next expansion of the mine into the South <br />Quarry (AM05). <br />6. Spill Control Measures. The spill control measures for fuels and other industrial materials were <br />examined. Secondary containment was in place and properly functioning at all the areas inspected. Spill <br />control equipment was in place. The Operator Representative stated that the Operator had an up to date <br />SPCC on file at the site. <br />7. Mine Operations. The mining appeared to be progressing in accordance with the mining plan for the <br />site. Active mining was occurring in the North Quarry, proceeding down and in a westerly direction. <br />No other problems were noted during the inspection. <br />