Laserfiche WebLink
,_~ <br />Richartl D. Lamm <br />Governor <br />Operation <br />RED CANYON MINE <br />File No.: C-034-81 <br />Operator Name: Grand Mesa Coai Company <br />Permittee Name: Same <br />Address: P.O. Box 226 <br />Delta, Colorado 81416 <br />County: Delta <br />Inspection Date: December 20, 1984 <br />Type of Operation: Underground, Federal <br />Inspector: Candace Thompson <br />Weather: Snowing and cold <br />Tiine: 8:00 a.m. <br />Type of Inspection: Partial <br />Operator Contact: Larry Reschke <br />III IIIIIIIIIIIII III <br />sss <br />I. General Comments <br />This was d partial inspection of the Red Canyon Mine. There was light snow <br />cover on the mine site. <br />Mr. Reschke and I discussed the channel reconstruction plan for the <br />reclamation phase. I encouraged him to contact me for further clarification <br />and possibly simplification of the additional designs needed in order for the <br />Division to approve the plan. <br />Mr. Reschke stated the sediment pond would need some further excavation and <br />rip-rapping of the inlet area before certification. The pond was not <br />discharging. <br />No problems noted. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel, (303) 866-3567 <br /> <br />DEPARTMENT OF NATURALRESOURCES <br />Davitl H. Getchea, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Olrector <br />COAL INSPECTION REPORT <br />