Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person NATIONAL KING COAL Number C-035-81 Date 10/02/2003 Continuation Page <br />28. Performa <br />3=Not Planned, 4=Not St. <br />D. Backfilline & <br />1. _ Mining within Valid Permit <br />2.., Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. ,Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Structures <br />4._ Discharge Structures <br />5._ Diversions <br />6. 1 Effluent Limits <br />7., Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1._ Remove] <br />2, 1 Substitute Materials <br />3., Storage and Protection <br />1._ Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5._ Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1._ Placement <br />2._ Drainage Control <br />3._ Surface Stabilization <br />4._ Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. 1 Drainage Control <br />2. 1 Surface Stabilization <br />3. 1 Placement <br />4. 1 Inspections and Certifications <br />5. 1 Impounding Structures <br />Use Of Explosives <br />L_ Blaster Certification <br />2. Distance Prohibitions <br />3._ Blnst Survey/Schedule - <br />4._ Warnings & Records <br />5._ Control of Adverse Effects - <br />E. <br />G. <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. Administrative .................................. ....................................... <br />1. Valid Permit ................................................. ..................................773.11 <br />~i 2. Mining within Bonded Area .................. ..............................773.11 <br />' 3. Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance ................................. ...............................800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation .............................. 842.1 I (e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondent ....... .........................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............ ......_._.....,........870.15(x) <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br />1. Drainage Convol .................................... .....................................45 <br />2. Inspections & Certifications ................... ..........................49(x)(!0) <br />3. Siltation S[rucmres .........................._..... .....................................46 <br />4. Discharge Structures ............................. ......................................47 <br />5. Diversions .............................................. .....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7. Ground Water Moni[oring ...................... ................................41(c) <br />8. Surface Water Monitoring ..................... .................................41(e) <br />9. Drainage--Acid -Toxic Materials .......... .................................41(0 <br />] 0. Impoundments ........................................ ..........................._.......49 <br />I1. Stream Buffer Zones .............................. .....................................57 <br />C. Topsoil &Subsoil ............................... ................(816/817.22) <br />1. Removal .................................................. ................................22(x) <br />2. Substitute Materials ................................ .................................22(c) <br />3. Storage and Protection ............................ .................................22(c) <br />4. Redis[ribu[ion ......................................... .................................22(d) <br />D, <br />1. <br />2. <br />3. <br />4. <br />S. <br />6. <br />7. <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ................._.................................._........ ...........................71(e) <br />2. Drainage Control .................................................... ...........................71(0 <br />3. Surface Stabihzation ..........................._.............._.. ............................71(g) <br />4. Inspections & Certi(ications......._ ........................... ._........................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(g16/817.81-84) <br />I. Drainage Control .................................................... ...........................83(x) <br />2. Surface Stabilizatioa ................_............................ _.........................83(6) <br />3. Placement ................................................................. ..........................83(c) <br />4. Inspections and Certifications...._ ..............._........... .........................83(d) <br />5. Impounding Structures ................................_........... ............_................84 <br />G. Use of Explosives ............................................ ......(816/817.61-68) <br />1. Blaster Certification ................................................. ..........................6](c) <br />2. Distance Prohibitions ............................................... ..........................61(d) <br />3. Blast Survey/Schedule ............................................. ..........................62-64 <br />4. Warnings & Records ............................................... .......................66 & 68 <br />5. Control of Adverse Effects._ .................................... ..............................67 <br />H. Subsidence Control Plan ................................ .........(817.121-122) <br />I. Roads ............................................................... ..(816/817.150-151) <br />1. Road Construction .................................................... .......................I50(c) <br />2. Certification .............................................................. ........................151(x) <br />3. Drainage ................................................................... ............150(6)-151(d) <br />4. Surfacing and Maintenance ...................................... ..._._....150(e)-151(d) <br />5. Reclamation ............................................................. .........................180(0 <br />Signs &Markers .......................................................(816/817.11) <br />1. Signs .....................................................................................77(x).(6),&(c) <br />2. Markers ......................................................................11(a).(6).(d).(e),&(0 <br />Distance Prohibitions .......................................................(761.11) <br />Revegetanon ..................................................... (816/817.111-116) <br />1. Vegetative Cover .......................................................................111 & 116 <br />2. Timing ..................................................................................................113 <br />Backfilling & Grading ..............................(816/817.95.107) K. <br />Exposed Openings .....................8] 6/817.13, 14, 15, & 823. ] I & 21 L <br />Contemporaneous Reclamation ......................... <br />Approximate Original Contour .......................... .........................100 <br />................102(x)(1) <br />Highwall Elimination ......................................_. ................102(x)(2) <br />Steep Slopes (includes downslope) .................... ........................107 <br />Handling of Acid & Toxic Materials ................. .....................102(c) <br />Stabilization (rills and gullies) ........................... .......................95(6) <br />M. Postmining Land Use ..............................................(816/817.133) <br />ae~~:ea n.a,me~q t~se Page 2 of <br />Elsewhere, 6=Previously Cited <br />H. _Subsidence Control Plan <br />I. Roads <br />L` Road Construction <br />2. Certification <br />3._ Drainage <br />4._ Surfacing and Maintenance <br />5. Reclamation <br />J• Signs & Markers <br />1._ Signs <br />2._ Markers <br />K. _Distance Prohibitions <br />L. Revegetation <br />1. 1 Vegetative Cover <br />2. 1 Timing <br />M. _Postmining Land Use <br />N. Other <br />General <br />Performance <br />Category <br />F_ 1 1) special focus: waste banks <br />