Laserfiche WebLink
<br />MINE ID # OR PROSPECTING ID #: M-Al-1 t9 <br />INSPECTION DATE: 7/t 7/00 <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible violations <br />should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The <br />inspector noted on the previous page should be notified of all corrective actions taken. <br /> <br />(Page 3) <br />INSPECTOR'S INITIALS: AC'S <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The north and east curved rtion of the bounds of the a roved ermit/affected area is not clear) 10 / O1 / 00 <br />mare as regwre as regwre y u e <br />PB or PV: ~_ <br />TOPIC(S): ~D1 <br />e oun sou c ear y mar a curv po ion o e perms a ec a area oun ary m w a ever _ - <br />manner the County rnnciders practical. Once this is done the County should notify the Division in <br />writing. <br />in <br />between the requirements of the min <br />10/01/00 <br />2. <br />to salvage and stockpile this resource as is required by C.R.S. 34-32.5-116(4)(g) and <br />Since information provided in the p~ti a k ge indicates that there is topsoil available at the site and <br />the reclamation plan commit the County to salvage and Mock iln e topsoil for gce in reclaiming h oit. <br />the County must submit a Technical Revision to the permit revising the mining plan and committing the <br />o n to salvage and stockpi~ topsoil. Within thic Technical Revision. the County m ~ t sods at how <br />remaining to be salvaged during future mining, is adequate to reclaim all the existing and anticipated <br />future disturbance at the site, as the reclamation plan requires. If this volume of topsoil cannot be shown <br />sufficient to meet the requirements of the reclamation plan, the County must indicate how it intends to <br />make up the deficiency, e.g. by importing material, revision of the reclamation plan. If the County intends <br />to revise the requirements of the reclamation plan. that should also be part of the proposed Technical <br />PB or PV: PB <br />TOPIC(S): TAMP <br />Revision <br />