Laserfiche WebLink
6 <br />III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was an aerial inspection of the New Horizon Mine for the month of September, 2000. The purpose <br />of this inspection is to conduct normal operations and environmental compliance. <br />HYDROLOGIC BALANCE: Mine 1: Ponds 1 and 6 had water in them but only 1 appeared to be <br />discharging as normal, all other ponds were dry. All ditches and culverts seem to be functioning as <br />designed. Mine 2. Pond 7 has water in it and Pond 8 has being mined out and will be reinstalled as the <br />pit is reclaimed. <br />BACKFILL & GRADING: B & G was in progress as is normal. No problems were noted. <br />EXPLOSIVES: Records were inspected and found to be in compliance. All blasting procedure's are <br />being followed and all seismograph readings show that each blast is in compliance. <br />RECLAMATION SUCCESS: The site continues to be in excellent condition. <br />GENERAL MINE COMPLIANCE The BB road detour appears to be in use and no problems could be <br />identified from the air. <br />