|
~•
<br />-wr~,r,rr~tw,x,..
<br />~.
<br />MINED LAND RECLAMATION DIVISION
<br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES
<br />NOTICE OF VIOLATI
<br />Permit No.: C-`,;I- 071
<br />Type of Mine: S„iG~c IF.,1~~~~
<br />Operator (If Other than Permittee):
<br />Mail Address:
<br />Inspector: ~~,,.,,: ~, t~,P
<br />Person Served:
<br />,: ', ;.
<br />,Signature o person served
<br />n. ~ ~ /~~ ;Y ~ ~~
<br />ease prin name an ti e
<br />NOV No. ~-~- 01 y
<br />Mine: ~,,;,,o I ~,-,~2. [, L„.~,. a.rk
<br />County: iQ,,,a.I.
<br />Permittee: n.,lov~.1„ v.._ n, r',,. 1 C'n,n..,.,,
<br />Mail Address: 2aS8Y 1R., it ^, _i., i2<~;,ul ~ ,
<br />(Juk ~rcr1[. hol,.r~~a ~o~lG7
<br />Date/Time of Inspection:
<br />c,r,~n 23. (ti b ~ ls:Dv
<br />~..
<br />Served.,By:
<br />~' ~ ~- -
<br />,~ ~~~ %:
<br />(Sigriatur~e.of authorized representative
<br />Hof Mined Land Reclamation Division)
<br />Date and Time of Service:
<br />A.M.
<br />CERTIFIED MAIL N0. -~~z~~~5?g ~;SS t~~1
<br />Return Receipt Requeste / / _-
<br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of
<br />the above mine and has made the findings stated in the attached schedule and has
<br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations
<br />of required permit conditions, listed in the attached schedule. This notice
<br />constitutes a separate notice of violation for each violation listed.
<br />You must abate each of these violations within the designated abatement time.
<br />Where the remedial action requires submission of plans, the plans are to be
<br />submitted to the Division within the designated time. You are responsible for
<br />doing all work in a safe manner in compliance with all applicable laws and
<br />regulations.
<br />The undersigned finds that cessation of mining is is not ~ expressly, or in
<br />practical effect, required by this notice. For this purpose, mining" means
<br />extracting coal from the earth or from a waste pile and transporting it within or
<br />from the mine site.
<br />C.R.S. 1913, 34-33-123(8) provides for imposition of civil penalties of up to
<br />;5,000 for each violation and provides that each day of continuing violation may be
<br />deemed a separate violation.
<br />Important: Please read the reverse side of this page.
<br />
|