Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />HG Mine C-8Q003_, <br />19 Nov 04 ~~~~ <br />Page 1/1 <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />This was a Partial inspection of the Hayden Gulch Mine conducted by Jim Stark of <br />CDMG. The mine has gone through a Phase I and Phase II Bond Release on all but <br />approximately nine acres. The mine is currently in its tenth year of liability. The <br />weather was cold and cloudy and the ground was covered with several inches of <br />snow. <br />Shrub parcel HG-08 was covered with snow at the time of the inspection. The parcel <br />appeared to be stable. The pond contained water and was discharging at the time <br />of the inspection (although the pond is no longer a part of the HG Mine permit). <br />The road to shrub parcel HG-08, parcel E and the 1997 slump area has some minor <br />rutting but remains stable. The road was covered with several inches of snow but <br />was passable. <br />Shrub Parcel E was covered with snow at the time of the inspection. The parcel <br />appeared to be stable and no erosional problems were noted. <br />The 1997 slump area was covered with snow at the time of the inspection. The area <br />appeared to be stable. All of the steel stakes placed across the slope remained in <br />alignment. No erosional problems were noted on the slump area. <br />Shrub parcel 003 was covered with snow but appeared to be stable at the time of <br />the inspection. There were no erosional problems noted on the parcel. Pond 003 <br />contained water but was not discharging at the time of the inspection. <br />Overall the entire site appeared to be in good condition. <br />