My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC37193
DRMS
>
Back File Migration
>
Inspection
>
INSPEC37193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:42:50 PM
Creation date
11/18/2007 10:59:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006077
IBM Index Class Name
Inspection
Doc Date
12/14/2006
Doc Name
Inspection report
From
DRMS
To
Paul Morgan Excavating, Inc.
Inspection Date
12/11/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />subtotals: 30.00 ~ so.oo <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Walsenburg <br />Transportation Cvcle Time : Non- Total one-way travel distance : 17.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.38 0.38 Total non-roadable mob/demob cost' : $1,287.53 <br />Return time (hours) = 0.38 0.38 "two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost" : $0.00 <br />Unloading time (hours) = 0.50 NA ~~ one round trip, no haul rig <br />Subtotals = 1.76 0.76 <br />JOB TIMEAND COST Total job time : 3.51 hours <br /> Total job cost : $1,288 <br />
The URL can be used to link to this page
Your browser does not support the video tag.