Laserfiche WebLink
G~ <br />STATE OF <br />OFFICE t~F THE STATE ENGINEER <br />Division d Mhter Resources <br />Oep~rtmeM d W Wral Resouces <br />7373 Sherman weer, Room eta <br />Demrer Colorado soso3 <br />Phone (3031866.3581 <br />FAx 1303) 866-3589 <br />wwr«rwtersrasnowus <br />DATE: <br />TO: <br />CC: <br />RECElVEp <br />MAY ~ S ~ <br />Oivisien of Mincrais and Geals~y <br />es onse to Reclamation Perntit Application Consideration <br />May 25, 200 <br />e . Gonima Environmental Protection Specialist <br />•, <br />eie Owcre <br />Goaemor <br />R,melt Ceorye <br />EacaN~e dretmr <br />Hal Q Si,ryaor,, P.E <br />Suee 6ipneer <br />Division ce, District 64 a er W ~ r "/j~" <br />FROM: loans Comaniciu. E.I. <br />RE: artnershlp, File No. M-2008-042 <br />Operator: M - 0-867-3824 <br />Contact: Mark Kokes-970-867-3624 <br />Section 34, Twp. 12 North, Rng 49 West, 6th P.M., Logan County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater, Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust conUol, ^reclamation, <br />^ water removed in the minetl product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, pdor to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applkxnt must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to ire obtained from Applicant needs to document that this water was <br />divorced in priority under a water right decreed for such indusUial use. Applicant should contact the <br />water commissioner for further information. <br />® The applicant has not identified any propOSetl use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the water was diverted in priority under a water right deueed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />