Laserfiche WebLink
;~ MOUNTAIN COAL COMPANY <br />WEST ELK MINE <br />Quarterly Stockpile and/or Site Inspection Report <br />Somerset, Gunnison County, Colorado <br />Date: June 27. 1997 Quarter: 2nd Ouarter Rept. 9 of 9 <br />Location: North Soil Storase Area Inspector: C. Johnston, J. Marerave <br />Features Problem Comments <br />Erosional: <br />Rills & Gullies Yes No <br />/ <br />Vegetation / <br />Other / <br /> <br />Drainage: <br />Ditches & Channels Yes No <br />/ <br />Silt fence installed on downstream side ofNSSA. <br />Berms / <br />Linings / <br />Temporary Structures / Ditch around topsoil pile is 95% complete. <br />Culverts (CMP) / <br />Other / <br /> <br />Structural: <br />Sideslopes & Stability Yes No <br />/ <br />Cracks or settling / <br />Compaction / <br />Seepage / <br />Underdrains / <br />Monitoring -Survey / <br />Monitoring -Visual / <br />Other / <br /> <br />Reclamation: <br />Seedbed Material Yes No <br />/ <br />Topsoil pile will be seeded 3rd or 4th quarter, <br />Subsoil / weatlterdependent. <br />Vegetation / <br />Mulch / <br />Other / <br /> <br />General Compliance & Miscellaneous: <br />Signs & Markers Yes No <br />/ <br />Spontaneous Combustion / <br />Roads / <br />Other / <br /> <br />Additional Comments: <br />Nielsons, Contractor for RPE and Sylvester Gulch construction is utilizing the NSSA as a laydown and office location. <br />Action Required or Needed: <br />None. <br />