Laserfiche WebLink
<br />MINE ID # OR PROSPECTING ID #: <br />INSPECTION DATE 9/30/93 & 10/1/93 <br />INSPECTOR'S INITIALS <br />LDO <br />The following problems (PB) and/or possible violations (PV) (and suc{gested corrective <br />actions) were iden[ified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the front page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORREC'CION <br />The Phase II drain blanket and raise I are being constructed DATE_ ~,,;! <br />i <br />1 of materials the Division believes to be not in accordance 11 _/ 15 _/ 93 _ ~`B:N(.~ ~ Cr <br />with permit approved specifications. <br />PF, or PV ~ ~ ~~~/~~/ ) ~ <br />TOPIC(S) ~ ~ <br />Demonstrate by written report that the materials being used <br />are within specifications approved in your permit or that the use -~ <br />of these materials will not unfavorably alter the function of the <br />ai ngs isposa aci i y or e rec ama ion o acility <br />as approved in your Hermit. <br />z. A spill of process water occurred outside of the lined 10 _/_31 _/ 93 ~'.~~. <br />containment facility October 1, 1993 as a result of failure pe or P P ~ r~J <br />to take proper precautions. M P ~ 'a~~ ' <br />~ _ i <br />Implement your permit approved spill response plan. - - - ~' - - <br />Submit a report on the spill and your response. Include <br />measures that will be taken to prevent this type of spill ~ ~ }/r,~,~~~~ <br />from happening in the future. F, ~ 'A'• ~~} <br />~A// ~(2i <br />~~ ~~~. <br />3 Spacing of drain pipes in the Phase II liner construction 1 1/ l 5/ 9 3 <br />area was over the 40' specification. PB or PV P B <br />TOPIC(S) M P <br />In your submittal for problem 1 above demonstrate that the - - - - - - <br />observed 40'-60' pipe spacings will be adequate for the <br />u <br />drainage blanket layer to drain the facility ,approved in <br />I <br />your permit. <br />(PAGE 3) . <br />M-88-112 <br />