Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID # M-1977-205 <br />INSPECTION DATE'12-$-2004 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1 ~ Mining and reclamatinn nneratipns are deviating from the ep rmit .~pacifirations <br />CORRECTIVE ACTION: <br />Submit a revision to incorporate the mining and reclamation plan deviations described in the text of <br />this report. into the~ermit. The revision must address~lans to continue dewatering thepits for mining <br />purposes. Phase 1 dam construction and enoineerina. river restoration engineering and design. <br />describe plans for future storaoe of waste asphalt {if applicable), and include a weed control plan. <br />2. NnnP. <br />CORRECTIVE ACTION: <br />3. <br />CORRECTIVE ACTION: <br />CORRECTION <br />DATE <br />03 / 18 / 2005 <br />PB or PV: PB <br />TOPIC(S): AR <br />~~~ <br />PB or PV: <br />TOPIC(S): _ <br />/ / <br />PB or PV: <br />TOPIC(S): _ <br />I, Steve Shuey, hereby certify that on January 27, 2005, I deposited a true and complete copy of this foregoing inspection report <br />in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, and to those <br />others within the body of this report who have been designated to receive copies (DMG personnel excepted). <br />Signature <br />