My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC36701
DRMS
>
Back File Migration
>
Inspection
>
INSPEC36701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:38:43 PM
Creation date
11/18/2007 10:57:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
3/25/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />MINE ID # OR PROSPECTING ID # M-77-436 <br />INSPECTION DATE_March 25, 1998 <br />INSPECTOR'S INITIALS TAS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />CORRECTIVE ACTIONS <br />1. The operator has water seeping into the excavation and <br />does not have approved water rights to account for <br />evaporative loss, as required by Senate Bill 120. <br />CORRECTIVE MEASURES <br />Complete one of the following corrective measures by <br />June 8, 1998 A) submit an application for a permit <br />revision with all pertinent details for the <br />installation of a slurry wall to prevent or minimize <br />water seepage into the pit, and complete installation <br />of the slurry wall within 90 days following Division <br />approval of the permit revision, B) submit a copy of <br />approval from the Office of the State Engineer of a <br />Temporary Substitute Supply Plan to account for <br />evaporative loss, or C) provide a reclamation bond <br />sufficient to cover the cost of all planned reclamation <br />Casks and backfilling the excavation to a depth that <br />is 2 feet above the static water level. <br />(Page 4) <br />CORRECTION <br />DATE <br />June 8, 1998 <br />PB or PV PB <br />TOPIC(S) HB,AR <br />
The URL can be used to link to this page
Your browser does not support the video tag.