Laserfiche WebLink
ro III IIIIIIIII IIII III <br />Wr``Me"~'`"~ti. U. S. DEPT. OF THE INTERIOR 999 <br />y ~ OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o !!!i ~ _° <br />°4qe~ _j0,q ~ Mine-Site Evaluation Inspection Report ~~F~FSUttFA~'~``~ <br /> 10. Type <br />1. Permittee/Person 9. Permit Number a. Permit b. RA <br /> WALDEN COAL CO. C-021-81 PP a <br /> 2. Address MAY 2 1~ 11. Ittspecuon Date 12. Inspection Type 13. Join[ Inspection <br /> P.O. BOX 229 03/30/94 C~ ~Y YiN <br /> L'F~isan of Minerals & eology wr - ~ - <br /> 3. City 4. State 14. Permit Status 15. Site Slams 16. Facility Type <br /> BOULDER CO a Pl <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. RSI # 19. Land Code <br />80306 -~ 303-444-2151 020 67 <br />7. Operator if Different than Permittee 20. M.S.HA. ID # 21. State Code 22. County Code <br /> OS-03517 OS 057 <br /> 8. Mine Name 23. AVS Penninee Entity ID Number 23b. State Office <br /> BOURG STRIP 056841 <br /> <br />24. Performance Standard Categories <br />Codes: 1=Com lien 2=Non~m lianc S=Not Plano 4=Not S =Noncom licence Identified Elsewhere <br />A. Administrative D. BackfiBing & Grading H. 3 Subsidence Control Plan <br />1. 1 Mining within Valid Permit 1. 1 Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation 1. 1 Road Construction <br />3. 1 Terms & Conditions of Permit 3. 1 Approximate Original Contour 2. 3 Certification <br />4. 1 Liability Insurance 4. 1 Highwall Elimination 3. 3 Drainage <br />5. 1 Ownerstup and Control 5. 3 Strip Slopes (includes downslope) 4. 3 Surfacing and Maintenance <br />6. 1 Temporary Cessation 6. 1 Handling of Acid & Toxic Materials 5. 1 Reclamation <br />B. Hydrologic Balance 7. 1 Stabilization (rills and gullies) - <br />1. I Drainage Control E- Excess Spoil Disposal J. Signs & Markers <br />2. 3 Inspections & Certifications 1. 3 Placement 1. 1 Signs <br />3. 1 Siltation Structures 2. 3 Drainage Control 2. 1 Markers <br />4. 3 Discharge Swctttres 3. 3 Surface Stabilization K. 1 Distance Prohibitions <br />5. 1 Diversions 4. 3 Inspections & Certifications - <br />6. 1 EflluentLimits L. Revegetation <br />7. 1 Ground Water Monitoring F. Coal Mine Waste 1. 1 Vegetative Cover <br />8. 3 Surface Water Monitoring (Refuse Piles/Impoundmeots) 2. 1 Timing <br />9. 3 Drainage -- Acid-Toxic Materials 1. 3 Drainage Control <br />10.3 Impoundments 2. 3 Surface Stabilization M. 1 Postmining Land Use <br />11.3 Stream Buffer Zones 3. 3 Placement <br />- 4. 3 Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5. 3 Impounding Structtrres <br />1. 3 Removal G. Use of Explosives -1) <br />2. 3 SubstituteMaterials 1. 3 BlasterCertitication <br />2) <br />3. 3 Storage and Protection 2. 3 Distance Prohibitions - <br />4. 1 Redistribution 3. 3 Blast Survey/Schedule <br />3) <br /> 4. 3 Warnings & Records - <br /> 5. 3 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a lie of Last <br />State Complete <br />lrtspegioa 12/01/93 <br /> <br />1S a Permit Review a. To W <br /> <br />122.7 bOR~ <br /> <br />173.0 e <br />Permitted <br />Frequency for previous 4 Cal®dar Qtrs. b. Phase I . <br />b. rN~umber of NumP rol <br />oiled mm late <br />wmptete ^q inspertiora a 4.5 b. Inspection Time 0.0 released h. Disoubed <br /> <br />122.7 <br />itspedians corduCed ~ <br />10.0 <br />T ~ c <br />0.0 . Phase II <br />released (Estimated) <br />c Numberol Numberof c. <br />ravel Time <br />p~artv~ial~ ^g m~ orrs ^g 3,p d <br />R <br />e <br />ort Writin U•U d. Phase III <br />l <br />d Page 1 of <br />Itspedprs opad~d . <br />p <br />g re <br />ease r,,;r+a ~,~~ <br />