Laserfiche WebLink
Richard D. Lamm <br />Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />Devid H. Getches, Executive Director <br />MINED LAND RECLAMATION DI\ <br />DAVID C. SFIELTON, Director <br />Operation: <br />File No.: <br />Operator Name: <br />Permittee Name <br />Address: <br />County: <br />Inspection Date: <br />Type of Operation <br />Inspector: <br />Weather: <br />Time: <br />Type of Inspection: <br />Operator Contact <br />COAL INSPECTION REPORT <br />BLUE RIBBON MINE <br />C-047-81 <br />Blue Ribbon Coal Company <br />Same <br />P.0 Box 58 <br />Delta, Colorado 81416 <br />Delta <br />April 24, 1985 <br />Underground, federal <br />Tom Gillis <br />Partly cloudy, cool <br />7:10-9:00 a.m. <br />Partial <br />Larry Reschke <br />I. General Comments <br />Bench construction activities have been suspended temporarily due to extremely <br />muddy conditions on and around the bench. The operator was working on <br />constructing the dip section at the Hubbard Creek crossing at the time of the <br />inspection. <br />Coal has been cleaned up from areas along Hubbard Creek. Heavy rains over the <br />previous weekend, however had exposed some coal material which was buried <br />under sediments by the flood. This material will be cleaned up when the <br />stream banks dry out sufficiently to allow equipment access. <br />Some minor sloughing has occurred along the access road cut slope and needs to <br />be cleaned up to improve drainage down the road ditch. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />