Laserfiche WebLink
=- <br />`~,EHT Or )H <br />P„ ` .. <br />OWP ~ ~` <br />..-. a <br />~ a <br />_.a ".5 <br />MACH ~ j0~ <br />U. S. DEPT. OF THE INTERIOR ~~~ ~~~~~~~~~~~~~ ~~~ .p <br />~ _. O <br />OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o i <br />Mine-Site Evaluation Inspection Report ~\f~r=R~AGi~j <br /> 10. Type <br />I. Pennittee/Person 9. Permit Number a. Permir h. RA <br /> HAYDEN GULCH TERMINAL, INC. RECE ~` /E C-081-92 PP <br /> 2. Address I I. Inspection Date 12. Inspection Type 13. Juint Inspectiun <br /> 1475 PINE GROVE RD., SUIT 06/03/1997 SCX ~Y yiN <br /> MM DD YY <br /> 3. City iviciH~~.~.r~~~iotft~9~dB91® 14. Permit Status I5. Site Status 16. Facility Type <br /> STEAMBOATSPR. CO A~ AN <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. RSI # 19. Land Code <br />80488 -~ 970-870-9006 140 <br />7. Operator if Different than Perm ittee 20. M.S.H.A. ID # 21. State Code 22. County Code <br /> OS-03138 08 107 <br /> 8. Mine Name 23. AVS Permittee Entity ID Number 23b. State Office <br /> HAYDEN GULCH LOADOUT 129412 <br />24. Performance Standard Categories <br />Codes: 1=Com fiance 2=Noncom fiance 3=Not Planned 4=Not Started 5=Noncom fiance Identified Elsewhere <br />A. Administrative D. Backfilling & Grading H. 3 Subsidence Control Plan <br />I. 1 Mining within Valid Perini[ I. 3 Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation I. I Road Construction <br />3. 1 Terms & Conditions of Perm it 3. I Approximate Original Contour 2, j Certification <br />4. 1 Liability Insurance 4. 1 Highwall Elimination 3. 1 Drainage <br />5. 1 Ownership and Conuol 5. 1 Sleep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6. 3 Temporary Cessation 6. 3 Handling of Acid & Toxic Materials 5. 1 Reclamation <br />B. Hydrologic Balance 7. 1 Stabilization (rills and gullies) <br />I. 1 Drainage Control E. Excess Spoil Disposal J. Signs & Markers <br />2. 1 Inspections & Certifications I. 3 Placement I. 1 Signs <br />3. 1 Siltation Structures 2. 3 Drainage Control 2. 1 Markers <br />4. l Discharge Structures 3. 3 Surface Stabilization K. 1 Distance Prohibitions <br />5. 1 Diversions 4. 3 Inspections & Certifications <br />6. 1 EfFluent Limits L. Revegetation <br />7. 1 Ground Water Monitoring F. Coal Mine Waste I. 1 Vegetative Cover <br />8. 1 Surface Water Monitoring (Refuse Piles/[mpoundments) 2. 1 Timing <br />9. 3 Drainage -- Acid-Toxic Materials I. 3 Drainage Control <br />10.3 Impoundments 2. 3 Surface Stabilization M. 1 Postmining Land Use <br />11. 1 Stream Buffer Zones 3. 3 Placement <br /> d. 3 Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5. 3 Impounding Stmctures <br />I. 1 Removal <br />G. Use of Explosives -I) <br />2. l Substitute Materials <br />3 <br />1 S <br />d P <br />i I. 3 Blaster Certification 2) <br />. <br />torage an <br />rotect <br />on 2. 3 Distance Prohibitions - <br />4. 3 Redistribution 3. 3 Blast Survey/Schedule 3) <br /> 4. 3 Warnings & Records _ <br /> 5. 3 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a Date of Lasl <br />State COmptete 02/24/1997 <br />Inspectwn <br /> <br />1.0 a. Permit Review <br />~ a <br /> <br />176.3 <br />~ . Total <br />bonded <br /> <br />Frequency for previous 4 Calendar Qtrs. <br /> <br />h <br /> <br />. Phase 1 176.3 <br />a. Pcrmittcd <br />b. Number of Number of <br />re uiretl can ete <br />tom fete 4 i~ a <br />~ <br />~ <br />~ <br />s ~ 5'~ b. Inspection Time 0.0 released <br />97,1 h. Disturbed <br />inspections <br />cond <br />uce <br />d ~ <br />v <br />Tr <br />l Time <br />7'~ ~ c <br />0•~ . Phase II <br />released (Estimated) <br />c. Number of Number of c. <br />a <br />e <br />required ^ partial ^ <br />panmt g inspections g <br />2,0 <br />ort Writin <br />d <br />R <br />0.0 d <br />Phase 111 <br />Page I of L <br />inspecons conduced g <br />. <br />ep released a..,..~r.~. ~.~w~ <br />