My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC36152
DRMS
>
Back File Migration
>
Inspection
>
INSPEC36152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:38:13 PM
Creation date
11/18/2007 10:55:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Inspection
Doc Date
12/9/1991
Doc Name
CORRECTIVE ACTION ITEMS 1-6 9/12/91 INSPECTION REPORT ACCESS ROAD EROSION CONTROL DESIGN SNYDER QUAR
From
MLRD
To
CASTLE CONCRETE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ i ~ ~ ~ ~~~ ~~~~~~~~~~~~~ ~~~ <br />STATE ~ COlLU1zAD0 <br />MINED LAND RECLAMATION DIVISION <br />oF.~o~ <br />Department of Natural Resources ~~;_~a~ <br />1313 Sherman St., Room 2~5 „°' ~ $ <br />Denver, CG 80203 ~ ~ ~ ry . <br />303 866-3567 ++`~,,Y <br />FA x. 303 832-8106 +ra 76 ~ <br />Roy Romer, <br />Governor <br />December 9 1991 FredR Bama. <br />r Division Director <br />Mr. Gordon Morgan <br />Castle Concrete Company <br />P. 0. Box 2379 <br />Colorado Springs, CO 80901 <br />RE: Corrective Action Items 1 - 6, September 12, 1991 Inspection Report/ <br />Access Road Erosion Control Design, Snyder Quarry, File No. M-77-210 <br />Dear Mr. Morgan: <br />The Division has conducted a follow-up inspection to determine compliance with <br />the Corrective Actions noted above. <br />Items 2, 3, 4, 5 and 6 have been completed satisfactorily. Item 1 was not <br />completed and is shown as new Item 1 in the November 27, 1991 inspection <br />report. As agreed to during the inspection, this Item is to be completd by <br />December 12, 1991. <br />The Access Road Erosion Control Design you submitted to comply with Items 4, 5 <br />and 6 has been reviewed by the Division and is approved. The work necessary <br />to implement this design should be completed by March 30, 1992. Submit to the <br />Division by this date a letter from a professional engineer certifying that <br />the project has been completed as designed. <br />Please call, if you have questions. <br />Sincerely, <br />~~ . ~~~ ~ <br />Larry .Oehler <br />Reclamation Specialist <br />LDO/gaw <br />cc: Dan Hernandez, MLRD <br />Allen Sorenson, MLRD <br />Mark Heffner <br />Bill Fullerton <br />9804E <br />
The URL can be used to link to this page
Your browser does not support the video tag.