Laserfiche WebLink
999 <br />BOARD OF COIINTY CO]YIDI2SSIONER: <br />DOLORES COIINTY <br />P.O. BOX 608 <br />DOVE CREEK, COLORADO 81324 <br />Phone 970-677-2383 <br />FAX # 970-677-2815 <br />p~NdER <br />OFFICE <br />Received <br />FE3 1 6 1g96 <br />February 13, 1996 <br />Colorado Division of Minerals & Geology <br />Attn: Wally Erickson <br />1474 Main Avenue, Room 207 <br />Durango, CO 81301 <br />RE: In regards to the inspections made on 1-24-96 <br />Durango Field Office <br />Division of ,:;G13f816 $ (~op~ppr <br />Cedar Point Pit #M-87-043 <br />#1. We are finished with all excavation at this pit, the <br />crusher and generator truck will be moved as soon as weather <br />permits. Stockpiles will be hauled off this summer and all <br />reclamation work completed. <br />#2. A TR to the Reclamation Plan Map has been sent to the <br />MLRB so as to leave the stock watering pond. <br />Bartley Gravel Pit #M-84-155 <br />#1. Backfill will be placed around utility poles where <br />necessary, graded to a 3 to 1 slope and revegetated as weather <br />permits. <br />I believe that our original permit states that we will stay at <br />least 50' from the natural gas pipeline running across the <br />permitted area. In any case we have completed all excavation <br />close to the pipeline or electrical poles. <br />#2. The County Weed Control District will be spraying weeds <br />at the appropriate time each summer. <br />Black Snag Pit #M-95-010 <br />#1. The Mine Identification sign has been posted at the North <br />entrance to the pit. Boundary markers have been placed at the <br />four corners of the permit area. <br />#2. Exploration holes which were dug with BLM permission <br />before a permit from MLRB was obtained will be backfilled and <br />reseeded this spring as weather permits. <br />#3. A TR has been submitted to the MLRB along with a revised <br />map showing all existing disturbance. <br />Thank You, <br />~.~ril <br />Tim Huskey, Road Supervi~crz- <br />