My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC35897
DRMS
>
Back File Migration
>
Inspection
>
INSPEC35897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:38:00 PM
Creation date
11/18/2007 10:53:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Date
6/16/1995
Doc Name
RESPONSE TO TELEPHONE CALL 06/15/95 REGARDING WEEKLY COA REPORT TESTING FRQUENCY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• l <br />• • <br /> <br />Golder Associates Inc. <br />200 Union Boulevard, Suite 500 <br />Lakewood, Colorado 80228 <br />(303) 980-0540 Phone <br />(303) 985-2080 Fax <br />June 15, 1995 <br />Project No. 953-2900 <br />TO: Mr. John Harlow ,Cripple Creek & Victor Gold Mining Company <br />FROM: Amy Robertson ~~ <br />RE: Soil Liner Fill Testing Frequency <br />It has come to our attention that the Division of Minerals and Geology has some questions <br />regazding our reported Soil Liner Fill testing frequency. As indicated on the testing frequency <br />table provided in Weekly Report 3 ("Earthworks CQA Test Summary and Testing Frequency, <br />Phase I 1995 Construction"), material quantities aze taken from ICC Daily Reports to Ford, <br />Bacon & Davis, and represent the quantity of material placed rather than the material ready <br />for testing. Although ICC reports indicate that they have placed 27,000 cubic yards of Soil <br />Liner Fill in the Phase I heap ]each pad through June 10, much of that material has only been <br />roughly graded, and has not been compacted. <br />The amount of Soil Liner Fill prepared and ready for testing can alternately be calculated from <br />the area of geomembrane deployed in the heap leach pad. According to our measurements, <br />approximately 330,450 square feet of 80 mil geomembrane has been deployed in the pad <br />through June 10. At an assumed depth of 12", the calculated amount of prepared and <br />approved Soil Liner Fill underlying geomembrane is 12,240 cubic yards. Attached is a table <br />showing Soil Liner Fill testing frequencies based on both Soil Liner Fill quantities provided by <br />ICC and calculated by the method described above. In the second instance, Soil Liner Fill <br />testing frequencies are greater than the specified frequencies for sieve analysis, Atterberg <br />Limit determination, and nuclear density testing. One permeability test is pending, and an <br />additional compaction test was completed on June t3. <br />Please let me know if I can provide any additional clarification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.